Interconnection queue in Utah — page 4

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown15433.8 GW
Active in queue33.8 GW154 requests
Agreement signed4,095 MW25 requests
Withdrawn64684.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

154 requests · page 4 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project T2-015, Salt Lake County
Gas · PacifiCorp
7.0 MWIn study Salt Lake, UTWest Aug 2025target 2026
Wind + storage project C1-04, Salt Lake County
Wind + storage
6.0 MWIn study Salt Lake, UTWest Apr 2021target 2023
Geothermal project T2-012, Beaver County
Geothermal
3.6 MWIn study Beaver, UTWest Aug 2025target 2025
Onshore wind project C1-58, Salt Lake County
Onshore wind
2.0 MWIn study Salt Lake, UTWest May 2021target 2023
Page 4 of 4

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20132025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)