United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Texas (2021 requests) — page 4

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown21541.1 GW
Active in queue41.1 GW215 requests
Agreement signed16.3 GW91 requests
Withdrawn7712.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

215 requests · page 4 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Third Coast BESS
Battery storage · Third Coast BESS LLC
103 MWAgreement signed Jackson, TXERCOT Aug 2021target 2027
Louisa Energy Storage
Battery storage · VESI 49 LLC
103 MWAgreement signed Bexar, TXERCOT Nov 2021target 2029
Seven Flags BESS
Battery storage · Seven Flags BESS LLC
103 MWAgreement signed Webb, TXERCOT Sep 2021target 2026
Tierra Seca BESS
Battery storage · Tierra Seca BESS LLC
103 MWAgreement signed Val Verde, TXERCOT Aug 2021target 2026
Bexar ESS
Battery storage · Bexar ESS LLC
103 MWAgreement signed Bexar, TXERCOT Sep 2021target 2025
Madrone Energy Storage
Battery storage
103 MWPaused / redesign Comal, TXERCOT Jan 2021
Opuntia Solar SLF
Solar + storage · Opuntia Solar, LLC
102 MWIn study Refugio, TXERCOT Aug 2021target 2028
Pisgah Ridge Solar 2
Solar + storage · Pisgah Ridge Solar 2, LLC
102 MWIn study Navarro, TXERCOT Jul 2021target 2026
Pisgah Ridge Storage 3
Solar + storage · Pisgah Ridge 3, LLC
101 MWIn study Navarro, TXERCOT Jul 2021target 2026
Las Moras Battery
Battery storage · Las Moras Storage, LLC
101 MWIn study Kinney, TXERCOT Jun 2021target 2029
Vaca Storage
Battery storage · Long Mount Storage, LLC
101 MWIn study Calhoun, TXERCOT Mar 2021target 2029
Paradiso BESS
Battery storage · VESI 13
101 MWAgreement signed Atascosa, TXERCOT Mar 2021target 2028
Ringtail Ridge Storage
Battery storage · KCE TX 26, LLC
101 MWIn study Kendall, TXERCOT Jan 2021target 2028
Hermes Solar
Solar + storage · Bell 1 Solar, LLC
100 MWAgreement signed Bell, TXERCOT Sep 2021target 2026
Galvanic BESS
Battery storage · CED Development Inc
100 MWIn study Kinney, TXERCOT Feb 2021target 2027
Backwater Storage
Battery storage
100 MWPaused / redesign Cooke, TXERCOT Sep 2021
Bordertown BESS
Battery storage
100 MWPaused / redesign Starr, TXERCOT Aug 2021target 2025
Sunsetter BESS
Battery storage · CED Development Inc.
100 MWIn study Uvalde, TXERCOT Feb 2021target 2027
Leitrim 1 Solar
Solar · Leitsol LLC
98.4 MWIn study Hill, TXERCOT Jan 2021target 2027
Midpoint Solar
Solar · Midpoint Solar, LLC
98.3 MWAgreement signed Hill, TXERCOT Oct 2021target 2026
Rocinante Solar
Solar + storage · Brush Country Solar Project, LLC
95.3 MWAgreement signed Gonzales, TXERCOT Apr 2021target 2027
High Noon Storage
Solar + storage · High Noon Solar Project, LLC
94.0 MWAgreement signed Hill, TXERCOT Nov 2021target 2028
Rosscommon Solar
Solar · Roscsol, LLC
91.0 MWIn study Lamar, TXERCOT Mar 2021target 2027
Payne Battlecreek
Solar · Gransolar Texas Ten, LLC
85.0 MWAgreement signed Hill, TXERCOT Aug 2021target 2027
Lupinus Storage 1
Solar + storage · Lupinus Solar, LLC
84.0 MWIn study Franklin, TXERCOT Dec 2021target 2027
Harper Energy Storage
Battery storage · VESI 31 LLC
82.4 MWIn study Cameron, TXERCOT Dec 2021target 2028
Sunbelt Solar
Solar + storage · Rose Hill Solar LLC
81.5 MWIn study Kaufman, TXERCOT Mar 2021target 2026
Backwater Solar
Solar
80.0 MWPaused / redesign Cooke, TXERCOT Aug 2021target 2024
Gaia Storage
Solar + storage · Gaia Solar, LLC
78.8 MWAgreement signed Navarro, TXERCOT Dec 2021target 2026
Naduah Solar
Solar · Gransolar Texas Fifteen, LLC
77.6 MWIn study Limestone, TXERCOT Sep 2021target 2027
Eagle Springs Solar
Solar + storage · Eagle Springs Solar, LLC
77.2 MWAgreement signed Delta, TXERCOT Oct 2021target 2026
Eytcheson Ranches Solar
Solar · Gransolar Texas Fourteen, LLC
76.4 MWIn study Navarro, TXERCOT Sep 2021target 2028
Photo BESS 1
Solar + storage · CED Development Inc.
75.0 MWIn study Uvalde, TXERCOT Oct 2021target 2027
Umbra (Stockyard) BESS
Battery storage
73.0 MWPaused / redesign Franklin, TXERCOT Jan 2021
Venture Hill Storage
Battery storage · KCE TX 24, LLC
70.4 MWIn study Travis, TXERCOT Feb 2021target 2026
Blue Jay Solar II
Solar · Blue Jay Solar I, LLC
69.0 MWAgreement signed Grimes, TXERCOT Apr 2021target 2025
Starling Storage
Solar + storage · Starling Storage, LLC
63.6 MWAgreement signed Gonzales, TXERCOT Jan 2021target 2027
Honeycomb Solar SLF
Solar + storage · Honeycomb Solar, LLC
61.4 MWAgreement signed Bee, TXERCOT Nov 2021target 2026
Orange Grove BESS
Solar + storage · Talitha Energy Project, LLC
61.4 MWAgreement signed Jim Wells, TXERCOT Jul 2021target 2027
Bird Dog Energy Storage
Battery storage · VESI 37 LLC
60.4 MWAgreement signed Live Oak, TXERCOT Feb 2021target 2026
Oriana BESS
Solar + storage · Oriana Solar LLC
60.3 MWAgreement signed Victoria, TXERCOT Aug 2021target 2028
Lampe Solar
Solar · Gransolar Texas Seven LLC
60.2 MWIn study Washington, TXERCOT Aug 2021target 2027
Whistle Solar
Solar · Gransolar Texas Nineteen, LLC
56.3 MWIn study Navarro, TXERCOT Nov 2021target 2028
Bynum Solar Project
Solar · Bynum Solar Project, LLC
56.0 MWAgreement signed Coryell, TXERCOT Dec 2021target 2026
Fighting Jays Battery
Battery storage
53.2 MWPaused / redesign Fort Bend, TXERCOT Aug 2021
Sunbelt Storage
Solar + storage · Rose Hill Solar LLC
52.0 MWIn study Kaufman, TXERCOT Nov 2021target 2026
Steppe Reserve Storage
Battery storage · KCE TX 25, LLC
51.9 MWIn study Dimmit, TXERCOT Jan 2021target 2028
High Chaparral BESS 138kV
Battery storage · High Chaparral Solar Project, LLC
51.7 MWPaused / redesign Brazoria, TXERCOT Jan 2021target 2023
Big River BESS
Solar + storage · Rio Grande River Solar LLC
51.3 MWIn study Zapata, TXERCOT May 2021target 2028
Lumberjack Storage
Battery storage · EDP Renewables North America LLC
50.9 MWAgreement signed Cherokee, TXERCOT Aug 2021target 2029

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)