Interconnection queue in Arkansas — page 4

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown15735.4 GW
Active in queue35.4 GW157 requests
Agreement signed1,783 MW13 requests
Withdrawn32457.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

157 requests · page 4 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project J2871, Mississippi County
Solar + storage
70.0 MWIn study Mississippi, ARMISO Oct 2025target 2025
Battery storage project GEN-2024-243, Crawford County
Battery storage
50.1 MWIn study Crawford, ARSPP Mar 2025target 2029
Battery storage project GEN-2023-206, Sebastian County
Battery storage
50.0 MWIn study Sebastian, ARSPP Oct 2023target 2029
Solar project J1670, Mississippi County
Solar
50.0 MWIn study Mississippi, ARMISO Jun 2020target 2025
Solar project J1258, Lonoke County
Solar
50.0 MWAgreement signed Lonoke, ARMISO Apr 2019target 2024
Solar project GEN-2024-312, Franklin County
Solar
50.0 MWIn study Franklin, ARSPP Mar 2025target 2030
Coal project J2081, Mississippi County
Coal
20.0 MWIn study Mississippi, ARMISO Aug 2021target 2027
Page 4 of 4

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)