Interconnection queue in ERCOT (Texas) — page 34

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,986447.3 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,986 requests · page 34 of 40
ProjectCapacityStatusLocationRegionQueuedOnline
Coleto Creek ESS Addition
Battery storage
100 MWPaused / redesign Goliad, TXERCOT Dec 2019
Ardesia Storage
Battery storage · Ardesia Storage Project LLC
100 MWIn study Caldwell, TXERCOT Jun 2022target 2027
Independence Trail Storage
Battery storage · KCE TX 16, LLC
100 MWIn study Childress, TXERCOT Dec 2019target 2028
Arroyo Solar
Solar + storage · BT Cantwell Solar, LLC
100 MWAgreement signed Cameron, TXERCOT May 2018target 2028
Callisto ID Energy Center
Battery storage · Tempus Power management LLC
100 MWIn study Harris, TXERCOT Oct 2024target 2026
Palmvalley Storage
Battery storage
100 MWPaused / redesign Hidalgo, TXERCOT Sep 2022target 2025
PSE Richardson TX Storage
Battery storage · PureSky Development Inc.
100 MWIn study Hidalgo, TXERCOT Dec 2022target 2027
Photo BESS 3
Solar + storage · CED Development Inc.
100 MWIn study Uvalde, TXERCOT Jul 2022target 2027
Erika BESS
Solar + storage · Erika Solar, LLC
100 MWIn study Kaufman, TXERCOT Jun 2025target 2029
Galvanic BESS
Battery storage · CED Development Inc
100 MWIn study Kinney, TXERCOT Feb 2021target 2027
Radiant Plains Energy Center Solar
Solar + storage · Adapture Solar Development
100 MWIn study Colorado, TXERCOT Jun 2025target 2029
San Bernard Solar
Solar · Sunchase Power
100 MWPaused / redesign Wharton, TXERCOT Jan 2017target 2022
Blue Summit Energy Storage
Wind + storage · NextEra Energy Interconnection Holdings, LLC
100 MWAgreement signed Wilbarger, TXERCOT Oct 2023target 2026
SPC Bloom BESS
Battery storage · BRP Blue Topaz 2, LLC
100 MWIn study Victoria, TXERCOT Dec 2020target 2027
IEP Blackhawk
Battery storage · IEP Texas Verde II, llc
100 MWIn study Galveston, TXERCOT Apr 2023target 2026
Backwater Storage
Battery storage
100 MWPaused / redesign Cooke, TXERCOT Sep 2021
Radiant Plains Energy Center BESS
Solar + storage · Adapture Solar Development
100 MWIn study Colorado, TXERCOT Jun 2025target 2029
Bordertown BESS
Battery storage
100 MWPaused / redesign Starr, TXERCOT Aug 2021target 2025
Sunsetter BESS
Battery storage · CED Development Inc.
100 MWIn study Uvalde, TXERCOT Feb 2021target 2027
Adam Bryant BESS
Battery storage · Adam Bryant BESS LLC
99.5 MWIn study Medina, TXERCOT Feb 2024target 2027
Cannibal Draw Storage
Solar + storage · Cannibal Draw Solar, LLC
98.6 MWAgreement signed Glasscock, TXERCOT Jul 2024target 2028
Leitrim 1 Solar
Solar · Leitsol LLC
98.4 MWIn study Hill, TXERCOT Jan 2021target 2027
Midpoint Solar
Solar · Midpoint Solar, LLC
98.3 MWAgreement signed Hill, TXERCOT Oct 2021target 2026
Rocinante Solar
Solar + storage · Brush Country Solar Project, LLC
95.3 MWAgreement signed Gonzales, TXERCOT Apr 2021target 2027
Visol 1 Solar
Solar · VISOL 1 SOLAR, LLC
94.8 MWIn study Val Verde, TXERCOT Oct 2023target 2028
Timmerman Power Plant Phase 2B
Gas · Lower Colorado River Authority
94.2 MWAgreement signed Caldwell, TXERCOT Oct 2025target 2026
Trinity Hills BESS SLF
Battery storage · Phoenix Battery Storage, LLC
94.0 MWIn study Archer, TXERCOT Nov 2023target 2027
High Noon Storage
Solar + storage · High Noon Solar Project, LLC
94.0 MWAgreement signed Hill, TXERCOT Nov 2021target 2028
PSE Minnesota TX Storage
Battery storage · PureSky Development Inc
94.0 MWIn study Hidalgo, TXERCOT Nov 2022target 2027
Anawa La Solar
Solar + storage · Anawa La Solar LLC
93.3 MWIn study Hidalgo, TXERCOT Mar 2024target 2027
Rattlesnake Gap Solar SLF
Solar + storage · ET Fuels US Inc.
93.0 MWIn study Howard, TXERCOT Sep 2025target 2029
Basketflower Storage
Solar + storage · Basketflower Solar, LLC
92.0 MWIn study Eastland, TXERCOT Oct 2024target 2027
Raghorn Solar SLF
Solar + storage · Raghorn Solar LLC
91.9 MWIn study Jim Wells, TXERCOT May 2024target 2027
Callan Solar
Solar · Menard PV, LLC
91.0 MWIn study Menard, TXERCOT Jun 2024target 2028
Rosscommon Solar
Solar · Roscsol, LLC
91.0 MWIn study Lamar, TXERCOT Mar 2021target 2027
Camellia Storage
Battery storage · Camellia Storage Project LLC
90.8 MWIn study Hidalgo, TXERCOT Jul 2022target 2027
Wild Horse Desert Storage
Solar + storage · Wild Horse Desert Solar, LLC
90.3 MWIn study Dimmit, TXERCOT Dec 2024target 2028
Tyson Nick Solar
Solar · Tyson Nick Solar Project, LLC
90.0 MWPaused / redesign Lamar, TXERCOT Dec 20182025
Wishbone Storage (SLF)
Battery storage
90.0 MWPaused / redesign Hidalgo, TXERCOT
Demeter Solar
Solar + storage · Demeter Solar, LLC
88.0 MWIn study Caldwell, TXERCOT Aug 2022target 2029
Bandana Solar SLF
Solar
86.9 MWPaused / redesign Jim Wells, TXERCOT Apr 2025
Ratcliff Solar
Solar · Greenalia Solar Power Ratcliff
85.7 MWIn study Freestone, TXERCOT Jun 2022target 2029
HappyDogSolar
Solar + storage · Rosula Solar LLC
85.5 MWAgreement signed Milam, TXERCOT Jun 2023target 2027
Payne Battlecreek
Solar · Gransolar Texas Ten, LLC
85.0 MWAgreement signed Hill, TXERCOT Aug 2021target 2027
RedSun BESS
Solar + storage · Gransolar Texas Twenty Two
84.0 MWIn study Burnet, TXERCOT Dec 2023target 2027
Lupinus Storage 1
Solar + storage · Lupinus Solar, LLC
84.0 MWIn study Franklin, TXERCOT Dec 2021target 2027
FLIFER Solar I
Solar · FLIFER LLC
84.0 MWIn study Ward, TXERCOT Mar 2023target 2027
Billie Storage
Battery storage · Weslaco Storage LLC
83.8 MWIn study Hidalgo, TXERCOT Jul 2024target 2029
Galaxy I Solar
Solar + storage · Galaxy Solar, LLC
82.9 MWIn study Ellis, TXERCOT Apr 2025target 2028
RedSun Solar
Solar + storage · Gransolar Texas Twenty Two
82.6 MWAgreement signed Burnet, TXERCOT Dec 2023target 2027
Page 34 of 40

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)