🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in ERCOT (Texas) — page 24

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,986447.3 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,986 requests · page 24 of 40
ProjectCapacityStatusLocationRegionQueuedOnline
Lone Star Industrial Park Gas Power Project
Gas · LONE STAR INDUSTRIAL PARK, LLC
166 MWIn study Morris, TXERCOT Sep 2024target 2028
CAROL wind
Onshore wind
165 MWPaused / redesign Potter, TXERCOT Dec 2018target 2024
Hart Wind (Old POI)
Onshore wind
165 MWPaused / redesign Castro, TXERCOT Feb 2014
Houston IV BESS
Battery storage · SMT Houston IV LLC
165 MWAgreement signed Harris, TXERCOT Jul 2023target 2026
Dos Rios Energy Storage SLF
Battery storage · DOS RIOS SOLAR, LLC
165 MWAgreement signed Milam, TXERCOT Nov 2022target 2027
Zeppelin Energy Storage
Battery storage · ZEPPELIN ENERGY STORAGE LLC
164 MWIn study Tom Green, TXERCOT Jan 2023target 2028
Dove Creek Solar
Solar + storage · Dove Creek Solar, LLC
164 MWIn study Tom Green, TXERCOT Jul 2024target 2028
BRP Pollux BESS
Battery storage · BRP Pollux BESS LLC
163 MWIn study Bosque, TXERCOT Jan 2022target 2026
Dove Creek Storage
Solar + storage · Dove Creek Solar, LLC
163 MWIn study Tom Green, TXERCOT Jul 2024target 2028
Concho Pearl Storage
Solar + storage · Concho Pearl Solar, LLC
162 MWAgreement signed Concho, TXERCOT Dec 2022target 2027
Lupinus Solar 1
Solar + storage · Lupinus Solar, LLC
162 MWAgreement signed Franklin, TXERCOT Dec 2021target 2027
Harald (BearKat Wind B)
Onshore wind · McCrae Wind Energy II, LLC
162 MWAgreement signed Glasscock, TXERCOT Nov 2013target 2026
Creekfield Solar
Solar
161 MWPaused / redesign Fort Bend, TXERCOT Jan 2020
Aster Solar
Solar · Aster Solar
161 MWIn study Guadalupe, TXERCOT Sep 2021target 2029
Weathervane Solar SLF
Solar
161 MWPaused / redesign Montague, TXERCOT Aug 2023target 2026
Solgen Solar
Solar + storage · Lampasas Hybrid Energy
160 MWIn study Lampasas, TXERCOT Apr 2025target 2029
Albatross BESS 2
Battery storage · Albatross Solar, LLC
160 MWIn study Mclennan, TXERCOT Feb 2024target 2028
Middlebrook BESS
Solar + storage · Middlebrook Solar LLC
159 MWAgreement signed Nacogdoches, TXERCOT Oct 2022target 2027
Stargazer Solar
Solar + storage · Stargazer Solar LLC
158 MWIn study Brazoria, TXERCOT Oct 2023target 2027
High Plains Storage
Battery storage · ROBP Holdings, LLC
158 MWIn study Harris, TXERCOT Sep 2022target 2028
Otter BESS
Battery storage · GRS BESS TEXAS TEN, LLC
157 MWIn study Bexar, TXERCOT Feb 2024target 2027
Pecan BESS
Battery storage · Gransolar Texas Three LLC
157 MWIn study Leon, TXERCOT Oct 2023target 2027
Cartwheel BESS 2
Battery storage · RWE Renewables
157 MWIn study Hopkins, TXERCOT Jun 2022target 2028
Strawberry Acres Storage
Battery storage · Strawberry Acres Energy Center, LLC
157 MWIn study Wilson, TXERCOT Nov 2022target 2028
Coyote Den Storage
Battery storage · Coyote Den Energy Center, LLC
157 MWIn study Karnes, TXERCOT Feb 2024target 2029
Austin Bayou Storage III
Solar + storage · Austin Bayou Solar, LLC
157 MWAgreement signed Brazoria, TXERCOT Mar 2023target 2027
Austin Bayou Storage II
Solar + storage · Austin Bayou Solar, LLC
157 MWAgreement signed Brazoria, TXERCOT Mar 2023target 2027
Firefly Fields Storage
Solar + storage · Firefly Fields Energy Center LLC
157 MWIn study Colorado, TXERCOT Mar 2025target 2028
Purple Sage BESS 2
Battery storage · Purple Sage, LLC
156 MWAgreement signed Collin, TXERCOT Mar 2023target 2027
Chimney Rock BESS
Battery storage · Taylor ESS, LLC
156 MWIn study Taylor, TXERCOT Feb 2025target 2028
Purple Sage BESS 1
Battery storage · Purple Sage, LLC
156 MWAgreement signed Collin, TXERCOT Mar 2023target 2027
Jackalope Solar
Solar · Peacock Energy Project, LLC
156 MWAgreement signed San Patricio, TXERCOT Feb 2021target 2025
Short Creek BESS
Solar + storage · Wichita Solar I, LLC
156 MWIn study Wichita, TXERCOT Apr 2023target 2027
Antonio Road BESS
Battery storage · Tempus Power management LLC
156 MWIn study Bastrop, TXERCOT Oct 2023target 2027
Salt-Lick Storage
Solar + storage · Salt-Lick Storage, LLC
155 MWIn study Culberson, TXERCOT Oct 2024target 2028
SOSA Storage
Battery storage · Sosa Energy Center, LLC
155 MWAgreement signed Madison, TXERCOT Jul 2022target 2027
Ranger BESS
Battery storage · Nova Clean Energy LLC
155 MWIn study Medina, TXERCOT Jun 2025target 2028
Winters Glow Storage
Solar + storage · Winters Glow Storage, LLC
155 MWIn study Runnels, TXERCOT Oct 2024target 2028
Dorsey Road BESS
Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC
155 MWIn study Bexar, TXERCOT Mar 2025target 2029
Berryman Road Storage
Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC
155 MWIn study Archer, TXERCOT Jun 2025target 2029
Galaxy Storage
Solar + storage · Galaxy Solar, LLC
155 MWIn study Ellis, TXERCOT Mar 2024target 2028
Bowstring BESS
Battery storage · Longbow Energy Storage, LLC
155 MWAgreement signed San Patricio, TXERCOT Nov 2020target 2028
Gunnar BESS
Battery storage · Gunnar Reliability Project LLC
155 MWAgreement signed Hidalgo, TXERCOT Feb 2023target 2026
SunWave Solar
Solar · Buckeye Nueces Bay Solar LLC
154 MWIn study Nueces, TXERCOT May 2023target 2028
Bastion BESS
Battery storage · BESS BASTION LLC
154 MWIn study Matagorda, TXERCOT Jul 2025target 2028
Valcrest BESS
Battery storage · Flexen USA LLC
154 MWIn study Galveston, TXERCOT Dec 2025target 2028
Roble BESS
Battery storage · Flexen USA LLC
154 MWIn study Guadalupe, TXERCOT Aug 2024target 2028
Crowned Heron BESS 2
Battery storage · RWE Renewables
154 MWAgreement signed Fort Bend, TXERCOT Nov 2022target 2026
Cartwheel BESS 1
Battery storage · Cartwheel BESS, LLC
154 MWAgreement signed Hopkins, TXERCOT Jun 2022target 2025
Pavo Creek Storage
Battery storage · Pavo Creek Storage, LLC
154 MWIn study Milam, TXERCOT Feb 2025target 2028
Page 24 of 40

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)