| Project | Capacity | Status |
|---|---|---|
| Cascabel Wind 1 Onshore wind · Vaquero Wind Energy, LLC |
198 MW | Agreement signed |
| Barrosos Creek Wind 4 Onshore wind · Cascabel Wind Energy, LLC |
198 MW | In study |
| Wood Fern Wind Onshore wind · Wood Fern Wind LLC |
197 MW | In study |
| Loma Pinta Wind Onshore wind · Enerverse |
197 MW | Agreement signed |
| Camino Santiago Solar Solar · Camino Solar Project, LLC |
196 MW | Agreement signed |
| Corralitos Wind 3 Onshore wind · Las Crestas Wind Energy, LLC |
196 MW | In study |
| Corralitos Wind 1 Onshore wind · Vaquero Wind Energy, LLC |
196 MW | Agreement signed |
| Johnson Grass Solar Solar · Johnson Grass Solar ,LLC |
196 MW | In study |
| Wolf Spring Solar Solar + storage · Wolf Spring Solar, LLC |
196 MW | Agreement signed |
| Corralitos Wind 4 Onshore wind · Las Crestas Wind Energy, LLC |
195 MW | In study |
| Corralitos Wind 2 Onshore wind · Vaquero Wind Energy, LLC |
195 MW | Agreement signed |
| Tres Bahias Solar Solar · Tres Bahias Solar Power LLC |
195 MW | Agreement signed |
| Paloma Energy Center Solar + storage · Harrison Street Development, LLC |
194 MW | In study |
| Steelhead Energy Storage Battery storage · GRS BESS TEXAS SEVEN, LLC |
192 MW | In study |
| Argenta Storage Solar + storage · Charter Oak Storage, LLC |
192 MW | Agreement signed |
| Malachite BESS Solar + storage · Malachite Storage LLC |
191 MW | In study |
| Pecos Wind Wind + storage · Midnight Energy Center, LLC |
191 MW | In study |
| Accalia Point Solar Solar · Accalia Point Solar LLC |
191 MW | In study |
| Bullring Wind 3 Onshore wind · Halcon Wind, LLC |
190 MW | Agreement signed |
| Harryoung Solar Solar + storage · Gransolar Texas Four LLC |
190 MW | In study |
| HarryoungBESS Solar + storage · Gransolar Texas Four LLC |
190 MW | In study |
| Crowded Star Solar II Solar + storage · Jones City Solar II, LLC |
190 MW | Agreement signed |
| Chacon Creek Battery storage · Cattlemen BESS LLC |
189 MW | In study |
| Blanket Ranch North Solar Solar + storage · Blanket Ranch North Solar, LLC |
189 MW | In study |
| Timmerman Power Plant Phase 2 Gas · Lower Colorado River Authority |
188 MW | Agreement signed |
| Serrano Storage Battery storage · Maverick ESS, LLC |
186 MW | In study |
| Wetzel BESS Battery storage · Brown ESS, LLC |
186 MW | In study |
| Montezuma Storage Battery storage · Montezuma Storage LLC |
185 MW | In study |
| Los Vientos IB Repower Onshore wind · Los Vientos Windpower IB, LLC |
185 MW | In study |
| Malachite Solar Solar + storage · Malachite Solar LLC |
185 MW | In study |
| Maldives Solar (Oncor POI) Solar |
184 MW | Paused / redesign |
| Cairos Storage 2 Battery storage · Cairos Solar, LLC |
184 MW | In study |
| Maldives Solar Solar · Maldives Solar LLC |
184 MW | Agreement signed |
| Arroyo Storage Solar + storage · BT Cantwell Solar, LLC |
184 MW | Agreement signed |
| Jalisco Peaker Gas · HEP Power Generation, LLC |
184 MW | In study |
| Leighton Solar SLF Solar · Lavender Solar LLC |
183 MW | Agreement signed |
| Basketflower Solar Solar + storage · Basketflower Solar, LLC |
183 MW | In study |
| Maryneal Wind Onshore wind · Maryneal Windpower, LLC |
182 MW | Agreement signed |
| Lan Solar SLF Solar + storage · BR Solar, LLC |
182 MW | In study |
| High Noon Solar Solar + storage · High Noon Solar Project, LLC |
182 MW | Agreement signed |
| Caesar Solar Solar + storage · Caesar Solar, LLC |
182 MW | In study |
| Nanulak BESS Battery storage · Nanulak BESS, L.L.C. |
182 MW | In study |
| Oak Belt Solar Solar + storage · Oak Belt Solar, LLC |
181 MW | In study |
| Azalea Springs Solar Solar · AZALEA SPRINGS SOLAR PARK LLC |
181 MW | Agreement signed |
| Oriana Solar Solar + storage · Oriana Solar LLC |
181 MW | Agreement signed |
| Turkey Creek Solar SLF Solar + storage · Greenray Solar Corporation |
181 MW | In study |
| Frizzle BESS Battery storage · Frizzle BESS, L.L.C. |
181 MW | In study |
| Nightfall Solar Solar · BDPU SOLAR NIGHTFALL, LLC |
181 MW | Agreement signed |
| Hofbrau BESS Battery storage · Momentum Hofbrau LLC |
181 MW | In study |
| Amphion Solar Phase 1 Solar · Amphion Solar, LLC |
181 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)