United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTMaldives Solar (Oncor POI)
Maldives Solar (Oncor POI) is a 184 MW solar request suspended in the ERCOT interconnection queue, in Scurry County, Texas.
Queue statusPaused / redesign
- PlanningQueued Dec 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 25INR0234
- Grid region
- ERCOT (Texas)
- Location
- Scurry County, Texas
- Technology
- Solar: 184 MW
- Total requested
- 184 MW
- Queue status
- Suspended
- Entered queue
- 6 December 2022
- Proposed online date
- July 2026
Location
Marker shows the centre of Scurry County; the queue data does not give exact sites.
Other requests in Scurry County
- Canyon WindOnshore wind Β· 309 MW Β· agreement signed
- Coyote WindOnshore wind Β· 243 MW Β· agreement signed
- Maldives SolarSolar Β· 184 MW Β· agreement signed
- Knapp BESSBattery storage Β· 10.0 MW Β· agreement signed
- Spectra SolarSolar Β· 1,200 MW Β· in study
- Zeus Scurry BESSSolar + storage Β· 1,043 MW Β· in study
- Zeus Scurry SolarSolar + storage Β· 504 MW Β· in study
- Cedar Draw SolarSolar + storage Β· 451 MW Β· in study
- Inadale BESSSolar + storage Β· 287 MW Β· in study
- Inadale SolarSolar + storage Β· 281 MW Β· in study
- Cedar Draw BESSSolar + storage Β· 226 MW Β· in study
- Fluvanna Max Solar SLFSolar + storage Β· 153 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem