United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in the USA — page 175

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown24,2054,519.8 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

24,205 requests · page 175 of 485
ProjectCapacityStatusLocationRegionQueuedOnline
Battery Storage
Battery storage
151 MWWithdrawn / abandoned Hampshire, MAISO-NE Sep 2023target 2027
Battery Storage
Battery storage
151 MWWithdrawn / abandoned Worcester, MAISO-NE Oct 2023target 2027
Avenida Del Sul
Solar
151 MWWithdrawn / abandoned Inyo, CACAISO Apr 2023target 2029
Ridge Solar Storage
Solar
151 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Onshore wind project GEN-2010-056, Holt County
Onshore wind
151 MWWithdrawn / abandoned Holt, MOSPP Oct 2010target 2012
Solar project 20171013002, Aiken County
Solar
151 MWWithdrawn / abandoned Aiken, SCSoutheast target 2020
Onshore wind project GEN-2016-088, Dekalb County
Onshore wind
151 MWWithdrawn / abandoned Dekalb, MOSPP Aug 20162021
Onshore wind project 225, Umatilla County
Onshore wind · Athena-Weston Wind Power Project, LLC
151 MWWithdrawn / abandoned Umatilla, ORWest May 2008
Onshore wind project GEN-2020-077, Thayer County
Onshore wind
151 MWWithdrawn / abandoned Thayer, NESPP Apr 20202025
Battery storage project AF2-214, Edgecombe County
Battery storage
151 MWWithdrawn / abandoned Edgecombe, NCPJM Mar 2020target 2022
Falcon Energy Center
Battery storage
151 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2018target 2021
Onshore wind project J321, Sanilac County
Onshore wind
151 MWWithdrawn / abandoned Sanilac, MIMISO Jan 2014target 2015
Onshore wind project 226, Umatilla County
Onshore wind · Athena-Weston Wind Power Project, LLC
151 MWWithdrawn / abandoned Umatilla, ORWest May 2008
Stomper Storage
Battery storage
151 MWWithdrawn / abandoned Alameda, CACAISO Apr 2021target 2024
Onshore wind project J076, Howard County
Onshore wind
151 MWWithdrawn / abandoned Howard, INMISO Oct 2009target 2012
Ruby Energy Storage
Battery storage
151 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2021target 2024
Onshore wind project J125, Macon County
Onshore wind
151 MWWithdrawn / abandoned Macon, ILMISO Aug 2011target 2014
Quail Lake Storage
Battery storage
151 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2025
Hopslam BESS
Battery storage · Momentum LRC Holdco LLC
151 MWWithdrawn / abandoned ERCOT Mar 2021target 2025
Gas project GEN-2009-013, Ford County
Gas
151 MWWithdrawn / abandoned Ford, KSSPP Mar 2009target 2011
Gas project GEN-2009-014, Barton County
Gas
151 MWWithdrawn / abandoned Barton, KSSPP Mar 2009target 2011
Rio Blanco Windfarm
Onshore wind · Horizon Wind Energy
151 MWWithdrawn / abandoned ERCOT Apr 2010target 2014
Onshore wind project 227, Grundy County
Onshore wind
151 MWWithdrawn / abandoned Grundy, TNSoutheast Dec 2010
Onshore wind project GI-47, Osage County
Onshore wind
151 MWWithdrawn / abandoned Osage, OKSoutheast Jan 2012target 2014
Texana Storage
Other · Louise Storage, LLC
151 MWWithdrawn / abandoned Wharton, TXERCOT Dec 2019target 2025
Larimar Solar
Solar · BT S7 Solar, LLC
151 MWWithdrawn / abandoned Bee, TXERCOT Jan 2024target 2026
Railyard Energy Storage
Battery storage
151 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2020target 2023
Berkman Storage
Battery storage · Berkman Storage, LLC
151 MWWithdrawn / abandoned ERCOT Aug 2022target 2027
Alta 1 Storage
Battery storage
151 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Solar project GEN-2017-066, Caddo County
Solar
151 MWWithdrawn / abandoned Caddo, OKSPP May 2017target 2020
Schoolhouse Solar
Solar · Schoolhouse Solar, LLC
151 MWWithdrawn / abandoned Lee, TXERCOT Jan 2019target 2025
Altamira Solar
Solar · J&R Power DevCo, LLC
151 MWWithdrawn / abandoned ERCOT Jan 2022target 2028
Schoolhouse BESS
Other · Schoolhouse Storage, LLC
151 MWWithdrawn / abandoned Lee, TXERCOT Jun 2022target 2025
Amberjill Energy
Solar + storage
151 MWWithdrawn / abandoned Imperial, CACAISO Apr 2023target 2029
Cold Creek Spring Wind
Onshore wind · NextEra Energy Resources, LLC
151 MWWithdrawn / abandoned Cattaraugus, NYNYISO Jun 2009
Urbana Solar
Solar
151 MWWithdrawn / abandoned Champaign, OHPJM Mar 2019target 2023
Unruh Solar
Solar · BT Unruh Solar, LLC
151 MWWithdrawn / abandoned ERCOT Jul 2023target 2025
Watkins Glen East
Onshore wind · NextEra Energy Resources, LLC
151 MWWithdrawn / abandoned Schuyler, NYNYISO Aug 2011
Pruett Solar
Solar · Crandall Solar LLC
151 MWWithdrawn / abandoned Wise, TXERCOT Feb 2022target 2027
Onshore wind project GEN-2016-029, Platte County
Onshore wind
151 MWWithdrawn / abandoned Platte, WYSPP Mar 2016target 2017
Onshore wind project GEN-2016-023, Platte County
Onshore wind
151 MWWithdrawn / abandoned Platte, WYSPP Mar 2016target 2017
Onshore wind project GEN-2015-031, Swisher County
Onshore wind
151 MWWithdrawn / abandoned Swisher, TXSPP Jun 2015target 2017
Pinscher Energy Storage
Battery storage
151 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2029
Canvasback BESS
Other · Black Mountain Energy Storage II
151 MWWithdrawn / abandoned Calhoun, TXERCOT Aug 2022target 2027
Onshore wind project GEN-2011-005, Butler County
Onshore wind
150 MWWithdrawn / abandoned Butler, NESPP Mar 2011target 2013
Onshore wind project GEN-2011-009, Washita County
Onshore wind
150 MWWithdrawn / abandoned Washita, OKSPP Mar 2011target 2013
Onshore wind project GEN-2015-008, Antelope County
Onshore wind
150 MWWithdrawn / abandoned Antelope, NESPP Mar 2015target 2016
Onshore wind project GEN-2011-004, Cowley County
Onshore wind
150 MWWithdrawn / abandoned Cowley, KSSPP Jan 2011target 2013
Onshore wind project J1195, Branch County
Onshore wind
150 MWWithdrawn / abandoned Branch, MIMISO Apr 2019target 2021
Onshore wind project GEN-2010-050, Anderson County
Onshore wind
150 MWWithdrawn / abandoned Anderson, KSSPP Sep 2010target 2012
Page 175 of 485

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)