SOLAR Β· ERCOTPruett Solar
Pruett Solar is a 151 MW solar request withdrawn in the ERCOT interconnection queue, in Wise County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2022 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0257
- Grid region
- ERCOT (Texas)
- Developer
- Crandall Solar LLC
- Connection point (POI)
- Tap 138kV 587 Greenwood - 685 Leo
- Location
- Wise County, Texas
- Technology
- Solar: 151 MW
- Total requested
- 151 MW
- Study phase
- FIS Complete
- Queue status
- Withdrawn
- Entered queue
- 27 February 2022
- Proposed online date
- May 2027
- Withdrawn
- April 2025
Location
Marker shows the centre of Wise County; the queue data does not give exact sites.
Other requests in Wise County
- Wise County Power Repower (CT1, CT2)Gas Β· 21.0 MW Β· agreement signed
- Gilleys Energy StorageBattery storage Β· 306 MW Β· in study
- Spur Energy StorageBattery storage Β· 306 MW Β· in study
- Solar Star Rhome StorageBattery storage Β· 221 MW Β· in study
- Legato BESSBattery storage Β· 203 MW Β· in study
- Pianissimo BESS IIBattery storage Β· 202 MW Β· in study
- Yooperlite StorageBattery storage Β· 176 MW Β· in study
- Sandford SolarSolar + storage Β· 126 MW Β· in study
- Sandford StorageSolar + storage Β· 101 MW Β· in study
- Connolly StorageOther Β· 125 MW Β· built
- Pruett StorageBattery storage Β· 50.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem