United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Pruett Solar

Pruett Solar is a 151 MW solar request withdrawn in the ERCOT interconnection queue, in Wise County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2022 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0257
Grid region
ERCOT (Texas)
Developer
Crandall Solar LLC
Connection point (POI)
Tap 138kV 587 Greenwood - 685 Leo
Location
Wise County, Texas
Technology
Solar: 151 MW
Total requested
151 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
27 February 2022
Proposed online date
May 2027
Withdrawn
April 2025

Location

Marker shows the centre of Wise County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Wise County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem