United States βΊ Grid βΊ Interconnection queues
BATTERY STORAGE Β· ERCOTBerkman Storage
Berkman Storage is a 151 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2022 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- ConsentedJan 2024 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0395
- Grid region
- ERCOT (Texas)
- Developer
- Berkman Storage, LLC
- Connection point (POI)
- 138 kV League City (Bus# 38920)
- Technology
- Battery: 151 MW
- Total requested
- 151 MW
- Study phase
- IA
- Queue status
- Withdrawn
- Entered queue
- 5 August 2022
- Agreement signed
- 9 January 2024
- Proposed online date
- May 2027
- Withdrawn
- March 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem