United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Berkman Storage

Berkman Storage is a 151 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2022 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. ConsentedJan 2024 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0395
Grid region
ERCOT (Texas)
Developer
Berkman Storage, LLC
Connection point (POI)
138 kV League City (Bus# 38920)
Technology
Battery: 151 MW
Total requested
151 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
5 August 2022
Agreement signed
9 January 2024
Proposed online date
May 2027
Withdrawn
March 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem