ONSHORE WIND Β· ERCOT

Rio Blanco Windfarm

Rio Blanco Windfarm is a 151 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0006
Grid region
ERCOT (Texas)
Developer
Horizon Wind Energy
Technology
Wind: 151 MW
Total requested
151 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 April 2010
Proposed online date
October 2014

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem