United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
ONSHORE WIND Β· SPPOnshore wind project GEN-2015-008, Antelope County
Onshore wind project GEN-2015-008, Antelope County is a 150 MW onshore wind request withdrawn in the SPP interconnection queue, in Antelope County, Nebraska, connecting to NPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2015 (completed)
- Withdrawn / abandonedOct 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2015-008
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- NPPD
- Connection point (POI)
- Antelope 115kV
- Location
- Antelope County, Nebraska
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 March 2015
- Proposed online date
- December 2016
- Withdrawn
- October 2015
Location
Marker shows the centre of Antelope County; the queue data does not give exact sites.
Other requests in Antelope County
- Onshore wind project GEN-2021-057, Antelope CountyOnshore wind Β· 300 MW Β· in study
- Onshore wind project GEN-2015-023, Antelope CountyOnshore wind Β· 301 MW Β· built
- Onshore wind project GEN-2013-032, Antelope CountyOnshore wind Β· 203 MW Β· built
- Onshore wind project GEN-2008-086N02, Antelope CountyOnshore wind Β· 201 MW Β· built
- Onshore wind project GEN-2014-013, Antelope CountyOnshore wind Β· 73.5 MW Β· built
- Onshore wind project GEN-2014-031, Antelope CountyOnshore wind Β· 35.8 MW Β· built
- Onshore wind project GEN-2014-032, Antelope CountyOnshore wind Β· 10.2 MW Β· built
- Solar project GEN-2018-044, Antelope CountySolar Β· 500 MW Β· withdrawn
- Onshore wind project GEN-2006-038N022, Antelope CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project GEN-2006-038N020, Antelope CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project GEN-2015-054, Antelope CountyOnshore wind Β· 74.0 MW Β· withdrawn
- Onshore wind project GEN-2013-005, Antelope CountyOnshore wind Β· 73.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem