Railyard Energy Storage

Railyard Energy Storage is a 151 MW battery storage request withdrawn in the CAISO interconnection queue, in Santa Clara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedApr 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1703
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
New Switchyard on Los Esteros-Trimble Line 115kV
Location
Santa Clara County, California
Technology
Battery: 151 MW
Total requested
151 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
October 2023
Withdrawn
April 2021

Location

Marker shows the centre of Santa Clara County; the queue data does not give exact sites.