ONSHORE WIND Β· SPPOnshore wind project GEN-2020-077, Thayer County
Onshore wind project GEN-2020-077, Thayer County is a 151 MW onshore wind request withdrawn in the SPP interconnection queue, in Thayer County, Nebraska, connecting to NPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingOct 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2020-077
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- NPPD
- Connection point (POI)
- North Hebron to Fairbury 115 kV
- Location
- Thayer County, Nebraska
- Technology
- Wind: 151 MW
- Total requested
- 151 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 28 April 2020
- Proposed online date
- October 2025
- Came online
- October 2025
- Withdrawn
- March 2024
Location
Marker shows the centre of Thayer County; the queue data does not give exact sites.
Other requests in Thayer County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem