United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
SOLAR Β· SPPSolar project GEN-2023-040, Thayer County
Solar project GEN-2023-040, Thayer County is a 105 MW solar request withdrawn in the SPP interconnection queue, in Thayer County, Nebraska, connecting to NPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-040
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- NPPD
- Connection point (POI)
- Carleton Junction 115 kV Substation
- Location
- Thayer County, Nebraska
- Technology
- Solar: 105 MW
- Total requested
- 105 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2030
- Withdrawn
- March 2024
Location
Marker shows the centre of Thayer County; the queue data does not give exact sites.
Other requests in Thayer County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem