United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Amberjill Energy

Amberjill Energy is a 151 MW solar + storage request withdrawn in the CAISO interconnection queue, in Imperial County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2213
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
IMPERIAL VALLEY 230 kV
Location
Imperial County, California
Technology
Solar: 101 MW · Battery: 50.2 MW
Total requested
151 MW
Service type
Energy only (ERIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
July 2029
Withdrawn
December 2025

Location

Marker shows the centre of Imperial County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Imperial County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem