Requests shown616153.0 GW
Active in queue227.7 GW896 requests
Agreement signed73.3 GW270 requests
Withdrawn2,149339.1 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

616 requests ยท page 11 of 13
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 424B, Leon County
Solar ยท FPL
74.5 MWIn study Leon, FLSoutheast Aug 2021target 2033
Solar project 424, Manatee County
Solar ยท FPL
74.5 MWIn study Manatee, FLSoutheast May 2021target 2027
Umbra (Stockyard) BESS
Battery storage
73.0 MWPaused / redesign Franklin, TXERCOT Jan 2021
Hoffman Falls Wind
Onshore wind ยท Hoffman Falls Wind LLC
72.0 MWIn study Madison, NYNYISO Jan 2021target 2027
Tarragon Hybrid
Solar + storage
71.9 MWIn study Fresno, CACAISO Apr 2021target 2028
Hammerhead Storage
Battery storage
71.3 MWIn study San Diego, CACAISO Apr 2021target 2030
Venture Hill Storage
Battery storage ยท KCE TX 24, LLC
70.4 MWIn study Travis, TXERCOT Feb 2021target 2026
Onshore wind project 401, Musselshell County
Onshore wind
70.0 MWIn study Musselshell, MTWest Jan 2021target 2023
Solar project J2177, Tipton County
Solar
67.0 MWIn study Tipton, INMISO Aug 2021target 2024
Onshore wind project J1998, Franklin County
Onshore wind
66.0 MWIn study Franklin, IAMISO Aug 2021target 2024
Solar project J2029, Marquette County
Solar
62.5 MWIn study Marquette, MIMISO Nov 2021target 2024
Lampe Solar
Solar ยท Gransolar Texas Seven LLC
60.2 MWIn study Washington, TXERCOT Aug 2021target 2027
Surplus; J878
Other
60.0 MWIn study MISO Apr 20212024
Solar project J1889, Linn County
Solar
60.0 MWIn study Linn, IAMISO Aug 2021target 2025
Battery storage project J1863, Otsego County
Battery storage
60.0 MWIn study Otsego, MIMISO Aug 2021target 2024
Battery storage project J1880, Ottawa County
Battery storage
60.0 MWIn study Ottawa, MIMISO Aug 2021target 2024
Edwards Calverton Battery Storage
Battery storage ยท Edwards Calverton Battery Storage
60.0 MWIn study Suffolk, NYNYISO Sep 2021target 2026
Battery storage project AH2-032, Prince William County
Battery storage
60.0 MWIn study Prince William, VAPJM Nov 2021target 2026
Battery storage project G0708, Morrow County
Battery storage
60.0 MWIn study Morrow, ORWest Oct 2021target 2023
Battery storage project G0707, Morrow County
Battery storage
60.0 MWIn study Morrow, ORWest Oct 2021target 2023
Solar project J1649, Mccracken County
Solar
60.0 MWIn study Mccracken, KYMISO Mar 2021target 2025
Battery storage project AH2-033, Prince William County
Battery storage
60.0 MWIn study Prince William, VAPJM Nov 2021target 2027
Solar + storage project IC-955, Lowndes County
Solar + storage
58.0 MWPaused / redesign Lowndes, ALSoutheast Apr 2021target 2026
Whistle Solar
Solar ยท Gransolar Texas Nineteen, LLC
56.3 MWIn study Navarro, TXERCOT Nov 2021target 2028
Battery storage project AH2-061, Prince William County
Battery storage
55.0 MWIn study Prince William, VAPJM Dec 2021target 2028
Battery storage project AH2-060, Prince William County
Battery storage
55.0 MWIn study Prince William, VAPJM Dec 2021target 2027
Fighting Jays Battery
Battery storage
53.2 MWPaused / redesign Fort Bend, TXERCOT Aug 2021
Mayacamas Geothermal
Geothermal
53.0 MWIn study Sonoma, CACAISO Apr 2021target 2030
Sunbelt Storage
Solar + storage ยท Rose Hill Solar LLC
52.0 MWIn study Kaufman, TXERCOT Nov 2021target 2026
Steppe Reserve Storage
Battery storage ยท KCE TX 25, LLC
51.9 MWIn study Dimmit, TXERCOT Jan 2021target 2028
High Chaparral BESS 138kV
Battery storage ยท High Chaparral Solar Project, LLC
51.7 MWPaused / redesign Brazoria, TXERCOT Jan 2021target 2023
Geranium Energy Storage
Battery storage
51.4 MWIn study San Diego, CACAISO Apr 2021target 2029
Big River BESS
Solar + storage ยท Rio Grande River Solar LLC
51.3 MWIn study Zapata, TXERCOT May 2021target 2028
Township Power Bank
Battery storage
50.5 MWIn study Sutter, CACAISO Apr 2021target 2028
Verbena Energy Storage
Battery storage
50.5 MWIn study Sutter, CACAISO Apr 2021target 2028
Findley Solar
Solar + storage ยท Gransolar Texas Sixteen, LLC
50.3 MWIn study Limestone, TXERCOT Oct 2021target 2028
Makalu Solar
Solar ยท Abei Energy Green X LLC
50.2 MWIn study Hunt, TXERCOT Jan 2021target 2028
Kifer BESS 1
Battery storage
50.0 MWIn study Santa Clara, CACAISO Apr 2021target 2025
Solar project J1935, Dane County
Solar
50.0 MWIn study Dane, WIMISO Nov 2021target 2025
Solar project J2292, Calcasieu Parish County
Solar
50.0 MWIn study Calcasieu Parish, LAMISO Sep 2021target 2027
Solar project J1529, Carroll County
Solar
50.0 MWIn study Carroll, IAMISO Apr 2021target 2026
Solar + storage project 417, Wheatland County
Solar + storage
50.0 MWIn study Wheatland, MTWest Nov 2021target 2022
Battery storage project J2159, Clark County
Battery storage
50.0 MWIn study Clark, ILMISO Aug 2021target 2024
Solar project J1530, Mills County
Solar
50.0 MWIn study Mills, IAMISO Apr 2021target 2026
Battery storage project J1984, Ottawa County
Battery storage
50.0 MWIn study Ottawa, MIMISO Aug 2021target 2024
Solar project J1532, Page County
Solar
50.0 MWIn study Page, IAMISO Apr 2021target 2026
Belen Energy
Battery storage
49.5 MWIn study Valencia, NMWest Jul 2021target 2025
Apogee Wind II
Onshore wind ยท King Creek Wind Farm 3, LLC
47.3 MWIn study Throckmorton, TXERCOT Jul 2021target 2027
Solar + storage project C1-10, Emery County
Solar + storage ยท Emery Bull Creek Energy, LLC
45.0 MWPaused / redesign Emery, UTWest Apr 2021target 2029
Solar + storage project AH2-028, Pickaway County
Solar + storage
44.0 MWIn study Pickaway, OHPJM Nov 2021target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)