United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESQueue requests in study in the USA (2021 requests) โ page 11
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 424B, Leon County Solar ยท FPL |
74.5 MW | In study |
| Solar project 424, Manatee County Solar ยท FPL |
74.5 MW | In study |
| Umbra (Stockyard) BESS Battery storage |
73.0 MW | Paused / redesign |
| Hoffman Falls Wind Onshore wind ยท Hoffman Falls Wind LLC |
72.0 MW | In study |
| Tarragon Hybrid Solar + storage |
71.9 MW | In study |
| Hammerhead Storage Battery storage |
71.3 MW | In study |
| Venture Hill Storage Battery storage ยท KCE TX 24, LLC |
70.4 MW | In study |
| Onshore wind project 401, Musselshell County Onshore wind |
70.0 MW | In study |
| Solar project J2177, Tipton County Solar |
67.0 MW | In study |
| Onshore wind project J1998, Franklin County Onshore wind |
66.0 MW | In study |
| Solar project J2029, Marquette County Solar |
62.5 MW | In study |
| Lampe Solar Solar ยท Gransolar Texas Seven LLC |
60.2 MW | In study |
| Surplus; J878 Other |
60.0 MW | In study |
| Solar project J1889, Linn County Solar |
60.0 MW | In study |
| Battery storage project J1863, Otsego County Battery storage |
60.0 MW | In study |
| Battery storage project J1880, Ottawa County Battery storage |
60.0 MW | In study |
| Edwards Calverton Battery Storage Battery storage ยท Edwards Calverton Battery Storage |
60.0 MW | In study |
| Battery storage project AH2-032, Prince William County Battery storage |
60.0 MW | In study |
| Battery storage project G0708, Morrow County Battery storage |
60.0 MW | In study |
| Battery storage project G0707, Morrow County Battery storage |
60.0 MW | In study |
| Solar project J1649, Mccracken County Solar |
60.0 MW | In study |
| Battery storage project AH2-033, Prince William County Battery storage |
60.0 MW | In study |
| Solar + storage project IC-955, Lowndes County Solar + storage |
58.0 MW | Paused / redesign |
| Whistle Solar Solar ยท Gransolar Texas Nineteen, LLC |
56.3 MW | In study |
| Battery storage project AH2-061, Prince William County Battery storage |
55.0 MW | In study |
| Battery storage project AH2-060, Prince William County Battery storage |
55.0 MW | In study |
| Fighting Jays Battery Battery storage |
53.2 MW | Paused / redesign |
| Mayacamas Geothermal Geothermal |
53.0 MW | In study |
| Sunbelt Storage Solar + storage ยท Rose Hill Solar LLC |
52.0 MW | In study |
| Steppe Reserve Storage Battery storage ยท KCE TX 25, LLC |
51.9 MW | In study |
| High Chaparral BESS 138kV Battery storage ยท High Chaparral Solar Project, LLC |
51.7 MW | Paused / redesign |
| Geranium Energy Storage Battery storage |
51.4 MW | In study |
| Big River BESS Solar + storage ยท Rio Grande River Solar LLC |
51.3 MW | In study |
| Township Power Bank Battery storage |
50.5 MW | In study |
| Verbena Energy Storage Battery storage |
50.5 MW | In study |
| Findley Solar Solar + storage ยท Gransolar Texas Sixteen, LLC |
50.3 MW | In study |
| Makalu Solar Solar ยท Abei Energy Green X LLC |
50.2 MW | In study |
| Kifer BESS 1 Battery storage |
50.0 MW | In study |
| Solar project J1935, Dane County Solar |
50.0 MW | In study |
| Solar project J2292, Calcasieu Parish County Solar |
50.0 MW | In study |
| Solar project J1529, Carroll County Solar |
50.0 MW | In study |
| Solar + storage project 417, Wheatland County Solar + storage |
50.0 MW | In study |
| Battery storage project J2159, Clark County Battery storage |
50.0 MW | In study |
| Solar project J1530, Mills County Solar |
50.0 MW | In study |
| Battery storage project J1984, Ottawa County Battery storage |
50.0 MW | In study |
| Solar project J1532, Page County Solar |
50.0 MW | In study |
| Belen Energy Battery storage |
49.5 MW | In study |
| Apogee Wind II Onshore wind ยท King Creek Wind Farm 3, LLC |
47.3 MW | In study |
| Solar + storage project C1-10, Emery County Solar + storage ยท Emery Bull Creek Energy, LLC |
45.0 MW | Paused / redesign |
| Solar + storage project AH2-028, Pickaway County Solar + storage |
44.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)172 ยท 56.8 GW
- CAISO (California)70 ยท 31.5 GW
- ERCOT (Texas)116 ยท 23.2 GW
- MISO (Midcontinent)126 ยท 22.4 GW
- Southeast (non-ISO utilities)44 ยท 9,966 MW
- SPP (Southwest Power Pool)25 ยท 5,570 MW
- PJM (Mid-Atlantic, Midwest)49 ยท 2,072 MW
- NYISO (New York)11 ยท 991 MW
- ISO-NE (New England)3 ยท 525 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)