NESO TEC REGISTER · GREAT BRITAIN

Onshore wind projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown32231.0 GW in total
In planning173scoping or awaiting consent
Consented or building41closest to connecting
Built108connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

322 projects · page 5 of 7
ProjectCapacityStageConnection siteFrom
Blackcraig Wind Farm
Onshore wind · Blackcraig Wind Farm (Scotland) Limited
53 MWBuilt Blackcraig 132/33kV
SP Transmission (south Scotland)
High Brenfield 1
Onshore wind · High Brenfield Wind Farm Limited
53 MWScoping Craig Murrail 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2034
Watten Wind Farm
Onshore wind · Edf Energy Renewables Limited
53 MWScoping Mybster 3 132/33kV Substation
SSEN Transmission (north Scotland)
Jun 2028
Baillie Wind Farm
Onshore wind · Baillie Windfarm Limited
53 MWBuilt Dounreay GSP
SSEN Transmission (north Scotland)
Harburnhead Wind Farm
Onshore wind · Ldv Harburnhead Limited
52 MWBuilt Livingston East 132/33kV
SP Transmission (south Scotland)
Middle Muir Wind Farm
Onshore wind · OnPath Energy Limited (MIDDLE MUIR WIND FARM) LIMITED
51 MWBuilt Middlemuir 132/33kV
SP Transmission (south Scotland)
Afton Wind Farm
Onshore wind · Afton Wind Farm Limited
50 MWBuilt Blackhill 132/33kV
SP Transmission (south Scotland)
Beinn an Tuirc 3
Onshore wind · Scottish Power Renewables (UK) Limited
50 MWBuilt Carradale 1 GSP
SSEN Transmission (north Scotland)
Breakish Windfarm
Onshore wind · Asuk Holdco 2 Limited
50 MWScoping Breakish 132kV Substation
SSEN Transmission (north Scotland)
May 2029
Cornharrow Wind Farm
Onshore wind · Energyfarm UK Cornharrow LLP
50 MWScoping Quantans Hill 132kV Substation
SP Transmission (south Scotland)
Oct 2030
Cumberhead
Onshore wind · Cumberhead Wind Energy Limited
50 MWBuilt Cumberhead 33kV
SP Transmission (south Scotland)
Fell Wind Farm
Onshore wind · Energyfarm UK Fell LLP
50 MWScoping SPT Margree collector substation
SP Transmission (south Scotland)
Oct 2029
High Constellation Windfarm
Onshore wind · High Constellation Windfarm Limited
50 MWConsents Approved High Constellation 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2028
Lairg II Wind Farm
Onshore wind · Lairg II LLP
50 MWConsents Approved Lairg GSP
SSEN Transmission (north Scotland)
Jul 2027
Margree Wind Farm
Onshore wind · Energyfarm UK Margree LLP
50 MWAwaiting Consents SPT Margree collector substation
SP Transmission (south Scotland)
Oct 2029
Overhill Wind Farm
Onshore wind · Energyfarm UK Overhill LLP
50 MWConsents Approved Overhill 132kV Substation
SP Transmission (south Scotland)
Jun 2029
Pines Burn Wind Farm
Onshore wind · Pines Burn Wind Farm LLP
50 MWConsents Approved Hawick GSP
SP Transmission (south Scotland)
Aug 2023
West Torrisdale
Onshore wind · Esb Asset Development UK Limited
50 MWScoping Carradale 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
May 2028
Aberarder Wind Farm
Onshore wind · Aberarder Wind Farm LLP
50 MWConsents Approved Aberarder Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Aug 2026
Glen Ullinish Wind Farm
Onshore wind · Glen Ullinish Wf Limited
50 MWConsents Approved Glen Ullinish 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2028
Millennium East
Onshore wind · Renantis UK Limited
50 MWScoping FORT AUGUSTUS 2 400/33kV GRID SUPPLY POINT SUBSTATION
SSEN Transmission (north Scotland)
Oct 2035
Dell Wind Farm
Onshore wind · Dell Wind Farm Limited
50 MWConsents Approved Dell 132kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Druim Leathann BEGA
Onshore wind · Druim Leathann Windfarm Limited
50 MWScoping Stornoway GSP
SSEN Transmission (north Scotland)
Mar 2027
Hollandmey Renewable Energy Development
Onshore wind · Scottish Power Renewables (UK) Limited
50 MWConsents Approved Hollandmey Renewable Energy Development132/33kV Substation
SSEN Transmission (north Scotland)
May 2030
Sallachy Wind Farm
Onshore wind · Sallachy Wind Limited
50 MWAwaiting Consents Cassley GSP
SSEN Transmission (north Scotland)
Jul 2028
Glen Kyllachy Wind Farm
Onshore wind · Glen Kyllachy Wind Farm Limited
49 MWBuilt Glen Kyllachy Wind Farm Substation
SSEN Transmission (north Scotland)
Hill of Towie/Drummuir
Onshore wind · Hill Of Towie Limited
48 MWBuilt Drummuir Windfarm at Keith 33kV Grid Supply Point
SSEN Transmission (north Scotland)
Crystal Rig IV Wind Farm
Onshore wind · Crystal Rig IV Limited
48 MWBuilt Crystal Rig 400kV substation
SP Transmission (south Scotland)
Broken Cross Windfarm
Onshore wind · Broken Cross Wind Farm Limited
48 MWBuilt Broken Cross 132/33kV
SP Transmission (south Scotland)
Apr 2026
Hopsrig Wind Farm
Onshore wind · Hopsrig Wind Farm Limited
48 MWConsents Approved Hopsrig Collector Substation
SP Transmission (south Scotland)
Oct 2027
Corriemoillie Wind Farm
Onshore wind · Rowan Onshore Windfarms Limited
48 MWBuilt Corriemoillie 132/33kV Substation
SSEN Transmission (north Scotland)
Garbet Wind Farm
Onshore wind · Garbet Wind Farm LLP
46 MWConsents Approved Keith 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2026
Hare Craig Wind Farm
Onshore wind · Hare Craig Windfarm LLP
46 MWAwaiting Consents Hare Craig 33kV Substation
SP Transmission (south Scotland)
Oct 2028
Blaen y Glyn
Onshore wind · Banc Du Energy Park Limited
46 MWScoping Chirk GSP
National Grid (England & Wales)
Feb 2027
Carraig Gheal Wind Farm
Onshore wind · Greenpower (Carraig Gheal) Limited
46 MWBuilt Carraig Gheal 132/33kV Substation
SSEN Transmission (north Scotland)
Crossdykes
Onshore wind · Crossdykes Wf Limited
46 MWBuilt Crossdykes 33kV
SP Transmission (south Scotland)
Callisterhall Wind Farm
Onshore wind · E Power Limited
46 MWScoping Callisterhall 132kV
SP Transmission (south Scotland)
Apr 2029
Douglas West
Onshore wind · Douglas West Wind Farm Ltd
45 MWBuilt Coalburn 400/132kV
SP Transmission (south Scotland)
Glenshimmeroch Windfarm
Onshore wind · Energyfarm UK Glenshimmeroch LLP
45 MWConsents Approved SPT Margree collector substation
SP Transmission (south Scotland)
Oct 2029
Giants Burn Wind Farm
Onshore wind · Gb Wind Farm Limited
44 MWScoping New Dunoon 132/33kV GSP Substation
SSEN Transmission (north Scotland)
May 2030
Beinn an Tuirc 2
Onshore wind · Scottish Power Renewables (UK) Limited
44 MWBuilt Carradale 1 GSP
SSEN Transmission (north Scotland)
Priestgill Wind Farm
Onshore wind · Priestgill Wind Farm Limited
44 MWConsents Approved Elvanfoot substation
SP Transmission (south Scotland)
Nov 2026
Windy Standard III Wind Farm
Onshore wind · Windy Standard III Limited
44 MWConsents Approved Dun Hill 132/33kV
SP Transmission (south Scotland)
Jun 2026
Berryburn Extension Wind Farm
Onshore wind · Bb2 Wind Farm Limited
43 MWConsents Approved Berryburn 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2027
Novar 2 Wind Farm
Onshore wind · Headwind Development Services Limited
43 MWScoping Alness GSP
SSEN Transmission (north Scotland)
Oct 2032
A'Chruach Wind Farm
Onshore wind · A'chruach Wind Farm Limited
43 MWBuilt A'Chruach Wind Farm 275kV Substation
SSEN Transmission (north Scotland)
Gladsmuir Wind Farm
Onshore wind · Wind Estate (UK) Limited
43 MWScoping Harburn 132/33kV Grid Supply Point Substation
SP Transmission (south Scotland)
Oct 2032
Windy Rig Wind Farm
Onshore wind · Windy Rig Wind Farm Limited
43 MWBuilt Blackhill 132/33kV
SP Transmission (south Scotland)
Greengairs East Wind Farm
Onshore wind · Greengairs East Wind Farm Limited
43 MWBuilt Cumbernauld 132/33kV
SP Transmission (south Scotland)
Craigneil Wind Farm
Onshore wind · Esb Asset Development UK Limited
42 MWScoping Fetteresso 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.