ONSHORE WIND Β· SPTPines Burn Wind Farm
Pines Burn Wind Farm is a 50 MW onshore wind project consented, connecting to the SP Transmission (south Scotland) network at Hawick GSP, with capacity due from August 2023. The connection agreement is held by Pines Burn Wind Farm LLP.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Aug 2023 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000897
- Customer
- Pines Burn Wind Farm LLP
- Technology
- Wind Onshore
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 2 August 2023
- Connection site
- Hawick GSP
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Hawick GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem