πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Onshore wind

ONSHORE WIND Β· SHET

Watten Wind Farm

Watten Wind Farm is a 53 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Mybster 3 132/33kV Substation, with capacity due from June 2028. The connection agreement is held by Edf Energy Renewables Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2028 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001928
Customer
Edf Energy Renewables Limited
Technology
Wind Onshore
Total capacity
53 MW
Change in this agreement
+53 MW
Capacity effective from
30 June 2028
Connection site
Mybster 3 132/33kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Mybster Β· Grid map

Other projects at Mybster 3 132/33kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem