Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SPTHopsrig Wind Farm
Hopsrig Wind Farm is a 48 MW onshore wind project consented, connecting to the SP Transmission (south Scotland) network at Hopsrig Collector Substation, with capacity due from October 2027. The connection agreement is held by Hopsrig Wind Farm Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Oct 2027 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000318
- Customer
- Hopsrig Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 48 MW
- Change in this agreement
- +48 MW
- Capacity effective from
- 31 October 2027
- Connection site
- Hopsrig Collector Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
- Connections reform gate
- Gate 2
Connection site
The connection site could not be placed on the map.
Projects connecting near Hopsrig Collector Substation Β· Grid map
Other projects at Hopsrig Collector Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem