Grid infrastructure β€Ί Connection queue β€Ί Onshore wind

ONSHORE WIND Β· SPT

Loganhead Windfarm

Loganhead Windfarm is a 36 MW onshore wind project consented, connecting to the SP Transmission (south Scotland) network at Hopsrig Collector Substation, with capacity due from October 2027. The connection agreement is held by Loganhead Wf Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2027 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000306
Customer
Loganhead Wf Limited
Technology
Wind Onshore
Total capacity
36 MW
Change in this agreement
+36 MW
Capacity effective from
31 October 2027
Connection site
Hopsrig Collector Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The connection site could not be placed on the map.

Projects connecting near Hopsrig Collector Substation Β· Grid map

Other projects at Hopsrig Collector Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem