Projects shown444102.5 GW in total
In planning303scoping or awaiting consent
Consented or building52closest to connecting
Built89connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

444 projects · page 5 of 9
ProjectCapacityStageConnection siteFrom
Thurso South BESS
Battery storage · WP Grid Storage 3 Limited
100 MWScoping Thurso South 275kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Glendoe
Hydro and pumped storage · Sse Generation Limited
100 MWBuilt Fort Augustus GSP
SSEN Transmission (north Scotland)
Breakish Windfarm
Onshore wind · Asuk Holdco 2 Limited
100 MWScoping Breakish 132kV Substation
SSEN Transmission (north Scotland)
Apr 2034
Brunt Hill Wind Farm
Wind + storage · Brunt Hill Limited
99 MWAwaiting Consents Westfield 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Car Duibh Wind Farm
Onshore wind · Car Duibh Wind Farm Limited
99 MWAwaiting Consents Car Duibh 275kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Elchies Wind Farm
Onshore wind · Elchies Wind Limited
99 MWScoping Elchies 132/33kV Substation
SSEN Transmission (north Scotland)
Nov 2028
Forsinain Wind Farm
Onshore wind · Forsinain Forest Wind Farm Limited
99 MWScoping Connagill 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Loch Liath Wind Farm
Onshore wind · Loch Liath Wind Farm Limited
99 MWAwaiting Consents Loch Liath 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2035
Quintfall Forest Hybrid Wind and BESS 1
Wind + storage · Voltalia UK Ltd
99 MWScoping Gills Bay 132kV
SSEN Transmission (north Scotland)
Oct 2037
Ballygroggan Wind Farm
Onshore wind · Dalriada Renewables Limited
96 MWScoping Ballygroggan 132/33Kv Substation
SSEN Transmission (north Scotland)
Oct 2034
Chleansaid Wind Farm
Onshore wind · Esb Asset Development UK Limited
96 MWConsents Approved Chleansaid Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Sep 2028
Tangy IV WF
Onshore wind · SSE Renewables Services (UK) Limited
96 MWScoping Tangy IV 132KV Substation
SSEN Transmission (north Scotland)
Apr 2029
17 Acres and BESS
Battery storage · Aeuk Battery Project II Ltd
96 MWScoping 17 Acres BESS 275Kv Substation
SSEN Transmission (north Scotland)
Jun 2032
Aberdeen Offshore Wind Farm
Offshore wind · Aberdeen Offshore Wind Farm Limited
96 MWBuilt Aberdeen Bay 132kV Substation
SSEN Transmission (north Scotland)
Beinn an Tuirc 1
Onshore wind · Scottish Power Renewables (UK) Limited
95 MWScoping Beinn an Tuirc Substation
SSEN Transmission (north Scotland)
Oct 2034
Braegrundie Farm
Battery storage · Aeuk Battery Project III Ltd
95 MWAwaiting Consents Braegrundie Farm 132kV Substation
SSEN Transmission (north Scotland)
Jun 2030
Dunmaglass Wind Farm
Onshore wind · Dunmaglass Wind Farm Limited
94 MWBuilt Dunmaglass 132kV Substation
SSEN Transmission (north Scotland)
Creag Riabhach Wind Farm
Onshore wind · Creag Riabhach Wind Farm Ltd
92 MWBuilt Creag Riabhach 132/33kV Substation
SSEN Transmission (north Scotland)
Pollie Hill Wind Farm
Onshore wind · Pollie Hill Wind Farm Limited
92 MWScoping Pollie Hill Wind Farm 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2031
Farr Wind Farm - Tomatin
Onshore wind · Farr Windfarm Limited
92 MWBuilt Beauly GSP
SSEN Transmission (north Scotland)
Kyllachy Wind Farm
Wind + storage · Wind Estate (UK) Limited
91 MWScoping Tomatin 132kV Substation Extension
SSEN Transmission (north Scotland)
Oct 2037
Breackerie wind farm
Wind + storage · Energyfarm UK Breackerie Ltd
91 MWScoping Breackerie 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Rowan Wind Energyfarm
Wind + storage · Energyfarm Rowan LLP
91 MWScoping Rowan 275/33kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Edinbane Windfarm
Wind + storage · Vattenfall Wind Power Ltd
90 MWScoping Edinbane 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2033
Fairburn Extension Wind Farm
Onshore wind · SSE Renewables Services (UK) Limited
90 MWScoping Fairburn Extension 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Kellas Wind Farm
Onshore wind · E Power Limited
90 MWScoping Kellas Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Woodcock Hill Wind Farm
Wind + storage · Perigus Energy UK Limited
90 MWScoping Woodcock Hill WF Substation
SSEN Transmission (north Scotland)
Oct 2032
Ceislein Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
86 MWScoping Ceislien Wind Farm
SSEN Transmission (north Scotland)
Oct 2030
Carn Fearna Wind Farm
Onshore wind · Carn Fearna Wind Farm Limited
85 MWScoping Carn Fearna Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Jun 2030
Acheilidh Wind Farm
Wind + storage · Energyfarm UK Acheilidh Ltd
84 MWScoping Acheilidh Wind farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Beinn Tharsuinn Repower
Onshore wind · Scottish Power Renewables (UK) Limited
84 MWScoping Beinn Thursunn Repower 275/33Kv
SSEN Transmission (north Scotland)
Oct 2029
Lynemore Wind Farm
Onshore wind · Galileo Empower UK Limited
84 MWScoping Lynemore Windfarm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Sheirdrim Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
84 MWScoping Sheirdrim 132kV Substation
SSEN Transmission (north Scotland)
Apr 2032
Kirkan Wind Farm
Wind + storage · Kirkan Wind Farm Limited
82 MWScoping Corriemoillie 2 400/132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Caorach
Wind + storage · Invenergy Development UK Ltd
81 MWScoping Caorach 132 KV Substation
SSEN Transmission (north Scotland)
Oct 2033
Sloy G2 and G3
Hydro and pumped storage · Sse Generation Limited
80 MWBuilt Sloy GSP
SSEN Transmission (north Scotland)
Tealing Solar & Storage
Solar + storage · Sirius Ecodev (Tealing) Ltd
80 MWAwaiting Consents Tealing IDNO 132/33kV GSP
SSEN Transmission (north Scotland)
Oct 2028
Coille Beith Wind Farm
Onshore wind · Coille Beith Wind Farm Limited
79 MWScoping Oykel Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Creachan Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
79 MWScoping Creachan Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Grimshader Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
79 MWScoping Grimshader Wind Farm Substation132 KV
SSEN Transmission (north Scotland)
Oct 2033
Kilbraur North Wind Farm
Onshore wind · Edf Energy Renewables Limited
79 MWScoping Kilbraur Wind Farm Substation
SSEN Transmission (north Scotland)
Oct 2031
Tarvie Wind Farm
Wind + storage · Koehler Renewable Energy UK Limited
77 MWScoping Beauly substation 275KV
SSEN Transmission (north Scotland)
Oct 2033
Abhainn Dubh Wind Farm
Onshore wind · E Power Limited
75 MWScoping Abhainn Dubh Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
May 2029
Errochty
Hydro and pumped storage · Sse Generation Limited
75 MWBuilt Errochty 132kV Substation
SSEN Transmission (north Scotland)
Windburn
Wind + storage · Windburn Wind Farm Limited
75 MWScoping Braco West GSP
SSEN Transmission (north Scotland)
Oct 2035
Braes of Doune
Onshore wind · Braes Of Doune Wind Farm (Scotland) Limited
74 MWBuilt Braco West GSP
SSEN Transmission (north Scotland)
Strath Oykel Wind Farm
Wind + storage · Energyfarm Strath Oykel LLP
74 MWAwaiting Consents Shin 1 GSP
SSEN Transmission (north Scotland)
Oct 2032
Craig Watch Wind Farm
Onshore wind · Craig Watch Wind Farm Limited
73 MWAwaiting Consents Craig Watch Wind Farm 132Kv Substation
SSEN Transmission (north Scotland)
May 2031
Narachan Wind Farm
Onshore wind · Energyfarm UK Narachan LLP
73 MWScoping Carradale 1 GSP
SSEN Transmission (north Scotland)
Apr 2030
Sloy G1 and G4
Hydro and pumped storage · Sse Generation Limited
73 MWBuilt Sloy GSP
SSEN Transmission (north Scotland)

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.