Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,590616.3 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,590 projects · page 21 of 32
ProjectCapacityStageConnection siteFrom
Limekiln
Wind + storage · Limekiln Extension Limited
167 MWScoping Limekilns 132/33kV substation
SSEN Transmission (north Scotland)
Dec 2030
Glendye Wind Farm
Onshore wind · Glendye Wind Farm Limited
167 MWScoping Glendye Wind Farm Substation
SSEN Transmission (north Scotland)
Apr 2034
Bowsheil Solar and Battery
Solar + storage · Voltalia UK Ltd
167 MWAwaiting Consents Bowsheils 132kV Substation
SP Transmission (south Scotland)
Oct 2031
Springfield Solar and Battery
Solar + storage · Voltalia UK Ltd
167 MWScoping Branxton 400/132kV
SP Transmission (south Scotland)
Oct 2031
Banc y Celyn Energy Park
Solar + storage · Parc Ynni Banc Y Celyn Cyf
165 MWScoping Rassau GSP
National Grid (England & Wales)
Oct 2037
Banc y Celyn Energy Park
Solar + storage · Wind 2 Project 2 Limited
165 MWScoping Future Swansea North 132kV
National Grid (England & Wales)
Jul 2033
Deucheran Hill 2 Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
165 MWScoping Deucheran Hill 2 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2034
Dolyfardyn
Onshore wind · Llyn Lort Energy Park Limited
165 MWScoping Chirk GSP
National Grid (England & Wales)
Feb 2027
Glen Lednock
Wind + storage · Glen Lednock Wind Farm Limited
165 MWScoping Glen Lednock 132kV Substation
SSEN Transmission (north Scotland)
Nov 2031
Balvedavist 162 Battery Storage
Solar + storage · S4N Spittal Ltd
162 MWAwaiting Consents Spittal 132kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Garn Fach Wind Farm
Wind + storage · Edf Energy Renewables Limited
162 MWScoping Mid Wales Connection Node A 400Kv Substation
National Grid (England & Wales)
Oct 2037
Balinoe Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
161 MWScoping Balinoe 132kV substation
SSEN Transmission (north Scotland)
Oct 2034
Derwent Solar PV Array
Solar · Anesco Limited
160 MWScoping Thornton 400kV Substation
National Grid (England & Wales)
May 2032
Tioram Wind Farm
Onshore wind · Invenergy Development UK Ltd
160 MWScoping New Carradale 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2037
Vicarage Drove BESS Limited
Battery storage · Vicarage Drove BESS Limited
160 MWScoping Navenby 132kV Substation
National Grid (England & Wales)
Oct 2039
Craigdarroch Hybrid Wind and BESS
Wind + storage · Voltalia UK Ltd
159 MWScoping Craigdarroch Hybrid Wind & BESS 132kV Substation
SP Transmission (south Scotland)
Jun 2037
Bryn Rhudd Energy Park
Onshore wind · Bryn Rhudd Energy Park Limited
159 MWScoping Pont Abraham GSP
National Grid (England & Wales)
Oct 2028
Moelfre Energy Park
Battery storage · Moelfre Energy Park Limited
158 MWScoping Bodelwyddan 400kV Substation
National Grid (England & Wales)
Oct 2029
Ruith Cnoc
Onshore wind · Ruith Cnoc Wind Farm Limited
158 MWScoping New Dalchork 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Longcroft Energy Park
Wind + storage · Glenburnie Energy Limited
156 MWScoping Longcroft Energy Park 132Kv Substation
SP Transmission (south Scotland)
May 2031
North Lowther Energy Initiative
Onshore wind · Glensalloch Wind Farm Limited
151 MWScoping NLEI Windfarm 132/33kV substation
SP Transmission (south Scotland)
Apr 2031
Y Bryn Wind Farm
Onshore wind · Y Bryn Wind Farm Limited
151 MWScoping Margam 275kV Substation
National Grid (England & Wales)
May 2029
Chapelcross Solar PV and Storage
Solar + storage · Eeb68 Limited
151 MWScoping Chapelcross 132/33kV
SP Transmission (south Scotland)
Oct 2027
Galileo 12 Limited
Solar + storage · Galileo 12 Limited
151 MWScoping Fetteresso 132kV substation
SSEN Transmission (north Scotland)
Oct 2033
Meall Dearg
Wind + storage · Energyfarm UK Meall Dearg Ltd
150 MWScoping New North West 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Acton Reynald
Solar + storage · Solar 2 Limited
150 MWScoping Staffordshire Connection Node D 132kV Substation
National Grid (England & Wales)
Oct 2037
Afan Wind Farm and BESS
Wind + storage · TRYDAN GWYRDD CYMRU (Welsh Government) Ltd
150 MWScoping South Wales West Connection Node A 132Kv Substation
National Grid (England & Wales)
Dec 2036
Arresgill Wind Farm
Onshore wind · Arresgill Energy Limited
150 MWScoping Arresgill 132kV Substation
SP Transmission (south Scotland)
Oct 2031
Axminster BESS
Battery storage · Cse25 Limited
150 MWScoping Axminster 132kV Substation
National Grid (England & Wales)
Oct 2028
Balrobert Farm BESS
Battery storage · Elgin Energy Es Co Limited
150 MWScoping Knocknagael 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
BESS North Farm
Battery storage · Rewe 5 Limited
150 MWScoping Chickerell 400kV Substation
National Grid (England & Wales)
Nov 2031
Bishops Dal Energy Park
Battery storage · Renewable Energy Systems Limited
150 MWScoping BISHOPS DAL ENERGY PARK 132kV SUBSTATION
SP Transmission (south Scotland)
Oct 2030
Bridge BESS
Battery storage · Apatura Battery Ltd
150 MWScoping Torness 400/132kV
SP Transmission (south Scotland)
Oct 2031
Carnedd Wen Wind Farm
Onshore wind · Carnedd Wen Wind Farm Limited
150 MWScoping Mid Wales West 132kV Substation
National Grid (England & Wales)
Oct 2030
Clifton Lane 150MW BSS
Battery storage · Renewables North West Ltd
150 MWScoping Frodsham 132kV
National Grid (England & Wales)
Oct 2037
Cnoc Buidhe Wind Farm
Wind + storage · Cnoc Buidhe Wind Energy Hub Limited
150 MWScoping Cnoc Buidhe 132kV/33kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Copper Nose BESS
Battery storage · Copper Nose Energy Ltd
150 MWScoping Fawley 132kV Substation
National Grid (England & Wales)
Oct 2036
Coylton 275kV Greener Grid Park
Battery storage · Coylton Energy Limited
150 MWScoping Coylton 275kV substation
SP Transmission (south Scotland)
Apr 2026
Downiebrae BESS
Battery storage · Downiebrae BESS Ltd
150 MWScoping Dalmarnock Storage BESS 132kV Substation
SP Transmission (south Scotland)
Apr 2028
Drum of Clunas Wind and Solar Park
Onshore wind · Broadhaven Distribution Limited
150 MWScoping Drum Of Clunas Wind 275Kv Substation
SSEN Transmission (north Scotland)
Oct 2031
Ebstree Road BESS
Battery storage · Voltwise Power Holdings Limited
150 MWScoping Staffordshire Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2037
Epworth PV & BESS Station
Solar + storage · Ibv Kelfield Solar Ltd
150 MWScoping Trent Valley North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Maesnant Energy Park
Onshore wind · Maesnant Energy Park Limited
150 MWScoping Chirk GSP
National Grid (England & Wales)
Nov 2033
Fairgreen Energy Storage
Battery storage · Renewable Energy Systems Limited
150 MWScoping Rayleigh Main 132kV Substation
National Grid (England & Wales)
Oct 2034
Feckenham Greener Grid Park
Battery storage · Statkraft UK Ltd
150 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2032
Galileo 07 Limited
Solar + storage · Galileo 07 Limited
150 MWScoping Galileo 07 Limited 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2032
Glentaggart 150MW BESS
Battery storage · Brockwell Energy Limited
150 MWScoping GLENTAGGART 150MW BESS 132kV SUBSTATION
SP Transmission (south Scotland)
Oct 2030
Halbeath
Solar + storage · Halbeath Solar Ltd
150 MWScoping Halbeath 132kV Substation
SP Transmission (south Scotland)
Jul 2029
Hazel Solar
Solar + storage · Hazel Solar Ltd
150 MWScoping Hawthorn Pit GSP
National Grid (England & Wales)
Oct 2035
Kedrum Solar Farm
Solar + storage · Rosside Energy Limited
150 MWAwaiting Consents Blackhillock 275kV Substation
SSEN Transmission (north Scotland)
May 2030
Page 21 of 32

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.