Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · NGETFeckenham Greener Grid Park
Feckenham Greener Grid Park is a 150 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Feckenham 400kV Substation, with capacity due from October 2032. The connection agreement is held by Statkraft UK Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2032 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001008-2
- Customer
- Statkraft UK Ltd
- Technology
- Energy Storage System
- Total capacity
- 150 MW
- Change in this agreement
- +138 MW
- Capacity effective from
- 31 October 2032
- Connection site
- Feckenham 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Feckenham 400kV Substation
- Feckenham Green Energy CentreSolar + storage · 1.0 GW · Scoping
- FeckenhamSolar + storage · 500 MW · Scoping
- Feckenham Energy ParkBattery storage · 500 MW · Scoping
- Boom Power Feckenham Generation HubSolar + storage · 400 MW · Scoping
- FeckenhamSolar + storage · 400 MW · Awaiting Consents
- Feckenham PV & BESS StationSolar + storage · 400 MW · Scoping
- Feckenham Greener Grid ParkBattery storage · 12 MW · Scoping
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem