Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · NGETBanc y Celyn Energy Park
Banc y Celyn Energy Park is a 165 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Future Swansea North 132kV, with capacity due from July 2033. The connection agreement is held by Wind 2 Project 2 Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jul 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002011
- Customer
- Wind 2 Project 2 Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 165 MW
- Change in this agreement
- +165 MW
- Capacity effective from
- 1 July 2033
- Connection site
- Future Swansea North 132kV
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem