Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · NGETVicarage Drove BESS Limited
Vicarage Drove BESS Limited is a 160 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Navenby 132kV Substation, with capacity due from October 2039. The connection agreement is held by Vicarage Drove BESS Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2039 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-006002
- Customer
- Vicarage Drove BESS Limited
- Technology
- Energy Storage System
- Total capacity
- 160 MW
- Change in this agreement
- +160 MW
- Capacity effective from
- 30 October 2039
- Connection site
- Navenby 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Other projects at Navenby 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem