SOLAR + STORAGE · NGETActon Reynald
Acton Reynald is a 150 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Staffordshire Connection Node D 132kV Substation, with capacity due from October 2037. The connection agreement is held by Solar 2 Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2037 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004437
- Customer
- Solar 2 Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 150 MW
- Change in this agreement
- +150 MW
- Capacity effective from
- 31 October 2037
- Connection site
- Staffordshire Connection Node D 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
This project connects at a new substation (a “connection node”) that has not been built or located yet.
Projects connecting near Staffordshire Connection Node D · Grid map
Other projects at Staffordshire Connection Node D 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem