Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINBattery storage projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Whitecraig BESS Battery storage · Apatura Battery Ltd |
200 MW | Scoping |
| Whitehill Battery Storage Battery storage · Whitehill Battery Storage Ltd |
200 MW | Consents Approved |
| WindyHill BESS2 Facility Battery storage · Windyhill Grid 2 Ltd |
200 MW | Scoping |
| WindyHill Energy Storage Facility Battery storage · Windyhill Grid 1 LTD |
200 MW | Consents Approved |
| Womblehill BESS Farm Battery storage · RE Projects Development Limited |
200 MW | Scoping |
| Woodcock Faulds Battery Storage Battery storage · Woodcock Faulds Battery Storage Limited |
200 MW | Scoping |
| Worset Lane BESS Battery storage · Field Hartmoor Ltd |
200 MW | Consents Approved |
| Yaxley BESS Battery storage · Field Yaxley Ltd |
200 MW | Scoping |
| Zenobe Blackhillock 300 MW Battery storage · Zenobe Blackhillock Limited |
200 MW | |
| Zenobe Coalburn Battery Storage Battery storage · Zenobe Coalburn Limited |
200 MW | Consents Approved |
| Zenobe New Deer Battery Storage Battery storage · Zenobe Energy Limited |
200 MW | Scoping |
| Tyler Hill Iver Battery storage · FRV Powertek Limited |
200 MW | Awaiting Consents |
| Manor Farm_Sidcup Battery storage · Firstway Solar Ltd |
200 MW | Scoping |
| Mill Hey_Capenhurst BESS Battery storage · Firstway Solar Ltd |
200 MW | Scoping |
| Deeside Power Station Battery storage · Deeside Power (UK) Limited |
190 MW | |
| NEL Nicholson Battery storage · UE 2 LTD |
180 MW | Scoping |
| Upper Greenfields BESS Battery storage · S4 UK DEV LTD |
175 MW | Scoping |
| Elstree Energy Storage Battery storage · Elstree Battery Storage Limited |
170 MW | Scoping |
| Gresham House Connagill BESS Battery storage · Energyhubdevelopments Limited |
170 MW | Scoping |
| Innerwick BESS Battery storage · Innerwick Storage Ltd |
170 MW | Scoping |
| Scotsburn Road Battery storage · Tbc 002 Limited |
170 MW | Scoping |
| Vicarage Drove BESS Limited Battery storage · Vicarage Drove BESS Limited |
160 MW | Scoping |
| Moelfre Energy Park Battery storage · Moelfre Energy Park Limited |
158 MW | Scoping |
| Axminster BESS Battery storage · Cse25 Limited |
150 MW | Scoping |
| Ayr Energy Storage Battery storage · Kxp Alpha I Limited |
150 MW | Consents Approved |
| Balrobert Farm BESS Battery storage · Elgin Energy Es Co Limited |
150 MW | Scoping |
| BESS North Farm Battery storage · Rewe 5 Limited |
150 MW | Scoping |
| Bishops Dal Energy Park Battery storage · Renewable Energy Systems Limited |
150 MW | Scoping |
| Bridge BESS Battery storage · Apatura Battery Ltd |
150 MW | Scoping |
| Clifton Lane 150MW BSS Battery storage · Renewables North West Ltd |
150 MW | Scoping |
| Copper Nose BESS Battery storage · Copper Nose Energy Ltd |
150 MW | Scoping |
| Coylton 275kV Greener Grid Park Battery storage · Coylton Energy Limited |
150 MW | Scoping |
| Downiebrae BESS Battery storage · Downiebrae BESS Ltd |
150 MW | Scoping |
| Ebstree Road BESS Battery storage · Voltwise Power Holdings Limited |
150 MW | Scoping |
| Fairgreen Energy Storage Battery storage · Renewable Energy Systems Limited |
150 MW | Scoping |
| Feckenham Greener Grid Park Battery storage · Statkraft UK Ltd |
150 MW | Scoping |
| Glennifer Road BESS Battery storage · Drax BESS Neilston Limited |
150 MW | Consents Approved |
| Glentaggart 150MW BESS Battery storage · Brockwell Energy Limited |
150 MW | Scoping |
| Killoch BESS Battery storage · Renewable Energy Systems Limited |
150 MW | Scoping |
| Lightsource Threepwood Battery storage · Lightsource Renewable UK Development Limited |
150 MW | Scoping |
| Lightsource Mount Annan BESS Battery storage · Lightsource Renewable UK Development Limited |
150 MW | Scoping |
| Neilston 132 Battery storage · Neilston Energy Limited |
150 MW | |
| Norrington Gate Battery storage · Adv 004 Limited |
150 MW | Consents Approved |
| Prestwold BESS Battery storage · Greentech Projects Holding UK Limited |
150 MW | Scoping |
| SSE Ferrybridge BESS Battery storage · Sse Battery Salisbury Limited |
150 MW | |
| SSE Fiddlers Ferry Battery Energy Storage Battery storage · Littleton Pastures Solar Limited |
150 MW | Consents Approved |
| Sutton Courtenay Battery storage · RWE Generation UK Plc |
150 MW | Scoping |
| Water Orton Battery storage · Voltwise Power Holdings Limited |
150 MW | Scoping |
| Weaver Island 150MW BESS Battery storage · Weaver Island BESS Ltd |
150 MW | Scoping |
| Westerton Lane BESS Battery storage · Apatura Project 22 Ltd |
150 MW | Scoping |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.