Battery storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown814219.0 GW in total
In planning609scoping or awaiting consent
Consented or building126closest to connecting
Built79connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

814 projects · page 10 of 17
ProjectCapacityStageConnection siteFrom
Whitecraig BESS
Battery storage · Apatura Battery Ltd
200 MWScoping Dalkeith 400kV Substation
SP Transmission (south Scotland)
Jun 2031
Whitehill Battery Storage
Battery storage · Whitehill Battery Storage Ltd
200 MWConsents Approved Easterhouse 275kV
SP Transmission (south Scotland)
Oct 2028
WindyHill BESS2 Facility
Battery storage · Windyhill Grid 2 Ltd
200 MWScoping Windyhill 275/132kV
SP Transmission (south Scotland)
Jul 2025
WindyHill Energy Storage Facility
Battery storage · Windyhill Grid 1 LTD
200 MWConsents Approved Windyhill 132kV
SP Transmission (south Scotland)
Dec 2027
Womblehill BESS Farm
Battery storage · RE Projects Development Limited
200 MWScoping Womblehill BESS Farm 132kV
SSEN Transmission (north Scotland)
Dec 2029
Woodcock Faulds Battery Storage
Battery storage · Woodcock Faulds Battery Storage Limited
200 MWScoping Gartclash Collector 275Kv Substation
SP Transmission (south Scotland)
Oct 2029
Worset Lane BESS
Battery storage · Field Hartmoor Ltd
200 MWConsents Approved Hartmoor 275kV Substation
National Grid (England & Wales)
May 2029
Yaxley BESS
Battery storage · Field Yaxley Ltd
200 MWScoping North Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Zenobe Blackhillock 300 MW
Battery storage · Zenobe Blackhillock Limited
200 MWBuilt Blackhillock 275kV Substation
SSEN Transmission (north Scotland)
Zenobe Coalburn Battery Storage
Battery storage · Zenobe Coalburn Limited
200 MWConsents Approved Coalburn North 400kV Substation
SP Transmission (south Scotland)
Aug 2027
Zenobe New Deer Battery Storage
Battery storage · Zenobe Energy Limited
200 MWScoping New Deer 400kV Substation
SSEN Transmission (north Scotland)
Oct 2029
Tyler Hill Iver
Battery storage · FRV Powertek Limited
200 MWAwaiting Consents London West Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2038
Manor Farm_Sidcup
Battery storage · Firstway Solar Ltd
200 MWScoping North Kent Connection Node C 132Kv Substation
National Grid (England & Wales)
Oct 2037
Mill Hey_Capenhurst BESS
Battery storage · Firstway Solar Ltd
200 MWScoping Capenhurst GSP
National Grid (England & Wales)
Oct 2037
Deeside Power Station
Battery storage · Deeside Power (UK) Limited
190 MWBuilt Connah's Quay 400kV Substation
National Grid (England & Wales)
Oct 2026
NEL Nicholson
Battery storage · UE 2 LTD
180 MWScoping Thorpe Marsh GSP
National Grid (England & Wales)
Oct 2035
Upper Greenfields BESS
Battery storage · S4 UK DEV LTD
175 MWScoping New Deer 2 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Elstree Energy Storage
Battery storage · Elstree Battery Storage Limited
170 MWScoping Letchmore Heath 132kV Substation
National Grid (England & Wales)
Jul 2030
Gresham House Connagill BESS
Battery storage · Energyhubdevelopments Limited
170 MWScoping New Connagill 275/132kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Innerwick BESS
Battery storage · Innerwick Storage Ltd
170 MWScoping Braxbess 400/132kV Collector Substation
SP Transmission (south Scotland)
Jul 2028
Scotsburn Road
Battery storage · Tbc 002 Limited
170 MWScoping Fyrish 275kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Vicarage Drove BESS Limited
Battery storage · Vicarage Drove BESS Limited
160 MWScoping Navenby 132kV Substation
National Grid (England & Wales)
Oct 2039
Moelfre Energy Park
Battery storage · Moelfre Energy Park Limited
158 MWScoping Bodelwyddan 400kV Substation
National Grid (England & Wales)
Oct 2029
Axminster BESS
Battery storage · Cse25 Limited
150 MWScoping Axminster 132kV Substation
National Grid (England & Wales)
Oct 2028
Ayr Energy Storage
Battery storage · Kxp Alpha I Limited
150 MWConsents Approved Ayr 275/33kV Substation
SP Transmission (south Scotland)
Oct 2028
Balrobert Farm BESS
Battery storage · Elgin Energy Es Co Limited
150 MWScoping Knocknagael 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
BESS North Farm
Battery storage · Rewe 5 Limited
150 MWScoping Chickerell 400kV Substation
National Grid (England & Wales)
Nov 2031
Bishops Dal Energy Park
Battery storage · Renewable Energy Systems Limited
150 MWScoping BISHOPS DAL ENERGY PARK 132kV SUBSTATION
SP Transmission (south Scotland)
Oct 2030
Bridge BESS
Battery storage · Apatura Battery Ltd
150 MWScoping Torness 400/132kV
SP Transmission (south Scotland)
Oct 2031
Clifton Lane 150MW BSS
Battery storage · Renewables North West Ltd
150 MWScoping Frodsham 132kV
National Grid (England & Wales)
Oct 2037
Copper Nose BESS
Battery storage · Copper Nose Energy Ltd
150 MWScoping Fawley 132kV Substation
National Grid (England & Wales)
Oct 2036
Coylton 275kV Greener Grid Park
Battery storage · Coylton Energy Limited
150 MWScoping Coylton 275kV substation
SP Transmission (south Scotland)
Apr 2026
Downiebrae BESS
Battery storage · Downiebrae BESS Ltd
150 MWScoping Dalmarnock Storage BESS 132kV Substation
SP Transmission (south Scotland)
Apr 2028
Ebstree Road BESS
Battery storage · Voltwise Power Holdings Limited
150 MWScoping Staffordshire Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2037
Fairgreen Energy Storage
Battery storage · Renewable Energy Systems Limited
150 MWScoping Rayleigh Main 132kV Substation
National Grid (England & Wales)
Oct 2034
Feckenham Greener Grid Park
Battery storage · Statkraft UK Ltd
150 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2032
Glennifer Road BESS
Battery storage · Drax BESS Neilston Limited
150 MWConsents Approved Glennifer Road BESS 132kV substation
SP Transmission (south Scotland)
Jul 2028
Glentaggart 150MW BESS
Battery storage · Brockwell Energy Limited
150 MWScoping GLENTAGGART 150MW BESS 132kV SUBSTATION
SP Transmission (south Scotland)
Oct 2030
Killoch BESS
Battery storage · Renewable Energy Systems Limited
150 MWScoping Killoch BESS 132kV Substation
SP Transmission (south Scotland)
Sep 2030
Lightsource Threepwood
Battery storage · Lightsource Renewable UK Development Limited
150 MWScoping Gala North 400/132kV Substation
SP Transmission (south Scotland)
Oct 2030
Lightsource Mount Annan BESS
Battery storage · Lightsource Renewable UK Development Limited
150 MWScoping Chapelcross 132/33kV
SP Transmission (south Scotland)
Oct 2031
Neilston 132
Battery storage · Neilston Energy Limited
150 MWBuilt Neilston 132kV Substation
SP Transmission (south Scotland)
Oct 2025
Norrington Gate
Battery storage · Adv 004 Limited
150 MWConsents Approved Melksham B 132KV Substation
National Grid (England & Wales)
Sep 2037
Prestwold BESS
Battery storage · Greentech Projects Holding UK Limited
150 MWScoping Derbyshire Connection Node F 132KV
National Grid (England & Wales)
Oct 2037
SSE Ferrybridge BESS
Battery storage · Sse Battery Salisbury Limited
150 MWBuilt Ferrybridge B 132kV Substation
National Grid (England & Wales)
SSE Fiddlers Ferry Battery Energy Storage
Battery storage · Littleton Pastures Solar Limited
150 MWConsents Approved Fiddlers Ferry 275kV Substation
National Grid (England & Wales)
Feb 2027
Sutton Courtenay
Battery storage · RWE Generation UK Plc
150 MWScoping Didcot 132kV Substation
National Grid (England & Wales)
Oct 2037
Water Orton
Battery storage · Voltwise Power Holdings Limited
150 MWScoping Warwickshire Connection Node F 132kV Substation
National Grid (England & Wales)
Oct 2037
Weaver Island 150MW BESS
Battery storage · Weaver Island BESS Ltd
150 MWScoping Elton (Merseyside 132kV Substation)
National Grid (England & Wales)
Oct 2037
Westerton Lane BESS
Battery storage · Apatura Project 22 Ltd
150 MWScoping Busby 275kV
SP Transmission (south Scotland)
Sep 2029
Page 10 of 17

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.