United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Texas (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown36979.0 GW
Active in queue79.0 GW369 requests
Agreement signed25.0 GW108 requests
Withdrawn11324.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

369 requests · page 1 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Hecate Energy Orem Wind
Onshore wind · Hecate Energy LLC
1,542 MWIn study Brazoria, TXERCOT Jun 2023target 2030
Aurelius Solar
Solar · IP Roman, LLC
1,124 MWAgreement signed Deaf Smith, TXERCOT Jul 2023target 2028
Hecate Energy Arkansas Wind
Onshore wind · Hecate Energy Gulf Wind LLC
1,029 MWIn study San Patricio, TXERCOT Jun 2023target 2030
Hecate Energy Jamaica Wind
Onshore wind · Hecate Energy LLC
1,029 MWIn study Galveston, TXERCOT Jun 2023target 2030
Ross Solar
Solar + storage · S&S Renewables, LLC
1,026 MWAgreement signed Refugio, TXERCOT Jul 2023target 2027
Gas project GEN-2023-204, Morris County
Gas
915 MWIn study Morris, TXSPP Oct 2023target 2028
Meitner Wind
Onshore wind · IP Meitner, LLC
709 MWAgreement signed Gray, TXERCOT Jul 2023target 2027
Jack County III – 345 kV
Gas · Jack County Power Development, LLC
660 MWIn study Jack, TXERCOT Nov 2023target 2027
Aurelius 3 Wind
Onshore wind · IP Roman III, LLC
623 MWIn study Deaf Smith, TXERCOT Dec 2023target 2029
Aurelius 2 Wind
Onshore wind · IP Roman Wind II, LLC
622 MWIn study Deaf Smith, TXERCOT Dec 2023target 2028
Aurelius Wind
Onshore wind · IP Roman Wind, LLC
622 MWAgreement signed Deaf Smith, TXERCOT Aug 2023target 2028
Tumbleweed Solar
Solar + storage · Hecate Energy Tumbleweed Solar LLC
614 MWIn study Borden, TXERCOT Sep 2023target 2027
White Oak King Wind
Onshore wind · KSK Wind Farm 1, LLC
607 MWIn study King, TXERCOT Mar 2023target 2027
Moccasin Solar
Solar + storage · Swenson Solar LLC
604 MWAgreement signed Stonewall, TXERCOT Sep 2023target 2027
Operation Sunshine
Solar + storage · Duck Creek Solar, LLC
603 MWAgreement signed Concho, TXERCOT Nov 2023target 2028
Rocking X Solar
Solar · 7100 Tin Top LLC
602 MWIn study Parker, TXERCOT Oct 2023target 2027
Longleaf Power Station
Gas · WattBridge Texas Holding, LLC
600 MWIn study Angelina, TXERCOT Oct 2023target 2028
Dundee East A Wind
Onshore wind · Felix 2, LLC
524 MWAgreement signed Baylor, TXERCOT Jan 2023target 2027
Sunscape Renewable Energy Solar SLF
Solar + storage · Sunscape Renewable Energy LLC
523 MWAgreement signed Nueces, TXERCOT Jun 2023target 2029
Avalon BESS
Battery storage · Avalon BESS, LLC
522 MWAgreement signed Fort Bend, TXERCOT Dec 2023target 2026
La Salle Solar
Solar · La Salle Solar LLC
513 MWAgreement signed La Salle, TXERCOT Apr 2023target 2027
Ross Storage
Solar + storage · S&S Renewables, LLC
511 MWAgreement signed Refugio, TXERCOT Aug 2023target 2027
Crescent C BESS
Battery storage · OCI La Salle ESS LLC
508 MWIn study La Salle, TXERCOT Apr 2023target 2028
Tumbleweed Storage
Solar + storage · Hecate Energy Tumbleweed Storage LLC
507 MWIn study Borden, TXERCOT Oct 2023target 2027
Oriole Solar
Solar + storage · Rolling Plains Solar
504 MWIn study Knox, TXERCOT May 2023target 2028
Freedom Falcon BESS
Battery storage · Falcon BESS, LLC
502 MWIn study Zapata, TXERCOT Jun 2023target 2028
Titus Sienta Solar
Solar · Sol Sienta Solar, LLC
502 MWIn study Pecos, TXERCOT Oct 2023target 2028
Orbit Energy Storage
Battery storage · GCI Orbit Energy Storage, LLC
502 MWIn study Bexar, TXERCOT Nov 2023target 2027
Salt-Lick Solar
Solar + storage · Salt-Lick Solar, LLC
453 MWIn study Culberson, TXERCOT Oct 2023target 2028
TRIFECTA Gas
Gas · NET Power
453 MWIn study Midland, TXERCOT Jun 2023target 2030
Aurelius 2 Solar
Solar · IP Roman, LLC
445 MWIn study Deaf Smith, TXERCOT Dec 2023target 2028
Cold Creek Solar 2
Solar + storage · Cold Creek Solar LLC
445 MWAgreement signed Schleicher, TXERCOT Dec 2023target 2028
Aurelius 3 Solar
Solar · IP Roman III, LLC
445 MWIn study Deaf Smith, TXERCOT Dec 2023target 2029
Panhandle Flagship Solar 1
Solar + storage · Panhandle Solar Group Operating Company LLC
439 MWAgreement signed Carson, TXERCOT Mar 2023target 2027
Western Flats Solar
Solar + storage · Hecate Energy Point Mountain Solar Facility 1 LLC
410 MWIn study Crane, TXERCOT Apr 2023target 2028
Silverton Solar
Solar · NextEra Energy Interconnection Holdings, LLC
410 MWIn study Briscoe, TXERCOT Dec 2023target 2029
McCamey's Castle Battery
Battery storage · Castle Storage, LLC
410 MWAgreement signed Upton, TXERCOT Oct 2023target 2027
Lund Storage Center 1
Battery storage · Lund Storage Center 1, LLC
408 MWIn study Bastrop, TXERCOT Jan 2023target 2026
Claire BESS
Battery storage · BRP Blue Topaz 3, LLC
406 MWIn study Harris, TXERCOT Feb 2023target 2027
Iron Belt Energy Storage
Battery storage · Iron Belt Energy Storage Project, LLC
402 MWAgreement signed Borden, TXERCOT Jan 2023target 2027
Boling Generation (TEF-Due Diligience)
Gas · Boling Generation
400 MWIn study Wharton, TXERCOT Dec 2023target 2027
Panhandle Flagship Storage
Solar + storage · Panhandle Solar Group Operating Company LLC
372 MWAgreement signed Carson, TXERCOT Mar 2023target 2027
Scott Crossing Solar SLF
Solar + storage · FRESH AIR ENERGY II, LLC
364 MWIn study Haskell, TXERCOT Mar 2023target 2027
Aldrin 345 BESS
Battery storage · Aldrin Energy Storage LLC
362 MWAgreement signed Brazoria, TXERCOT May 2023target 2027
Channing Wind
Onshore wind
361 MWPaused / redesign Oldham, TXERCOT Dec 2023target 2028
Tetris Solar
Solar · NextEra Energy Interconnection Holdings LLC
359 MWIn study Zapata, TXERCOT Jul 2023target 2029
Tetris Solar (Alternative POI)
Solar
359 MWPaused / redesign Zapata, TXERCOT Jul 2023target 2028
Funston Solar (AEP POI)
Solar
355 MWPaused / redesign Jones, TXERCOT Sep 2023target 2028
Lucy Solar
Solar · Concho County Solar 1 LLC
352 MWAgreement signed Concho, TXERCOT Jun 2023target 2027
Titus Low Carbon Ventures Solar 1
Solar · Vaquero Solar, LLC
338 MWIn study San Patricio, TXERCOT Oct 2023target 2028
Page 1 of 8

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)