United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTTetris Solar
Tetris Solar is a 359 MW solar request in interconnection study in the ERCOT interconnection queue, in Zapata County, Texas.
Queue statusIn planning
- PlanningQueued Jul 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 28INR0005
- Grid region
- ERCOT (Texas)
- Developer
- NextEra Energy Interconnection Holdings LLC
- Connection point (POI)
- TAP 345kV 80307 Del Sol 7C - 80225 Cenizo 7C
- Location
- Zapata County, Texas
- Technology
- Solar: 359 MW
- Total requested
- 359 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 28 July 2023
- Proposed online date
- July 2029
Location
Marker shows the centre of Zapata County; the queue data does not give exact sites.
Other requests in Zapata County
- Cascabel Wind 2Onshore wind Β· 198 MW Β· agreement signed
- Cascabel Wind 1Onshore wind Β· 198 MW Β· agreement signed
- Corralitos Wind 1Onshore wind Β· 196 MW Β· agreement signed
- Corralitos Wind 2Onshore wind Β· 195 MW Β· agreement signed
- Falcon BESSBattery storage Β· 517 MW Β· in study
- Freedom Falcon BESSBattery storage Β· 502 MW Β· in study
- Vaquero 1 WindOnshore wind Β· 400 MW Β· in study
- Sierra Madre SolarSolar Β· 255 MW Β· in study
- Zelus BESSBattery storage Β· 201 MW Β· in study
- Falcon Zapata Storage 138Battery storage Β· 201 MW Β· in study
- Barrosos Creek Wind 3Onshore wind Β· 198 MW Β· in study
- Barrosos Creek Wind 4Onshore wind Β· 198 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem