🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Zelus BESS

Zelus BESS is a 201 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Zapata County, Texas.

Queue statusIn planning
  1. PlanningQueued Dec 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
24INR0131
Grid region
ERCOT (Texas)
Developer
BRP Zelus BESS LLC
Connection point (POI)
the 138 kV Zapata Substation (#8299; AEP)
Location
Zapata County, Texas
Technology
Battery: 201 MW
Total requested
201 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
20 December 2021
Proposed online date
December 2027

Location

Marker shows the centre of Zapata County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Zapata County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem