United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in PJM (Mid-Atlantic, Midwest) (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown345,884 MW
Active in queue10.1 GW68 requests
Agreement signed4,211 MW34 requests
Withdrawn31146.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

34 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Maidsville CCGT
Gas
1,270 MWPaused / redesign Preston, WVPJM Sep 2018target 2026
Ocean Wind
Offshore wind
816 MWPaused / redesign Ocean, NJPJM May 2018target 2026
Ocean Wind LLC
Offshore wind
432 MWPaused / redesign Cape May, NJPJM Sep 2018target 2026
Livingston Wind
Onshore wind Β· Livingston Wind Project, LLC
255 MWIn study Livingston, ILPJM Sep 2018target 2021
Broomstick Solar Energy Centergy Center
Solar
210 MWPaused / redesign Christian, ILPJM Mar 2018target 2028
Fountain Point Solar
Solar Β· Fountain Point Solar Energy LLC
207 MWIn study Union, OHPJM Aug 2018target 2021
Lower Crossing Wind
Onshore wind
200 MWPaused / redesign Kankakee, ILPJM Jan 2018target 2026
Golden Aster Solar Energy Center
Solar
160 MWPaused / redesign Grant, INPJM Sep 2018target 2026
Energy Mountain
Battery storage
150 MWPaused / redesign Bucks, PAPJM Mar 2018target 2029
Wingstem Solar Energy Farm
Solar
150 MWPaused / redesign Cass, MIPJM Sep 2018target 2025
Leaf River Wind
Onshore wind Β· Leaf River Wind, LLC
150 MWIn study Ogle, ILPJM Sep 2018target 2021
Pilesgrove Solar Project
Solar
149 MWPaused / redesign Salem, NJPJM Sep 2018target 2027
Maroon Solar
Solar
149 MWPaused / redesign Culpeper, VAPJM Sep 2018target 2027
Meadow Forge Solar Energy Center
Solar
130 MWPaused / redesign Delaware, INPJM Sep 2018target 2026
CC Solar I
Solar
120 MWPaused / redesign Caroline, VAPJM Sep 2018target 2025
Strawhat Solar Energy Center
Solar
110 MWPaused / redesign Hardin, OHPJM Aug 2018target 2026
Headwaters Wind Farm III
Onshore wind
100 MWPaused / redesign Randolph, INPJM Sep 2018target 2026
Madison County Solar
Solar
100 MWPaused / redesign Madison, INPJM Mar 2018target 2025
Blue Jay Solar
Solar
100 MWPaused / redesign Pulaski, VAPJM Mar 2018target 2025
Headwaters Wind Farm III
Onshore wind
100 MWPaused / redesign Randolph, INPJM Sep 2018target 2026
Bakers Pond Solar
Solar
100 MWPaused / redesign Prince George, VAPJM Sep 2018target 2026
Brandonville Solar
Solar
99.6 MWPaused / redesign Preston, WVPJM Sep 2018target 2026
Raleigh Solar Project
Solar
90.0 MWPaused / redesign Raleigh, WVPJM Sep 2018target 2025
Beaver Creek Solar
Solar
80.3 MWPaused / redesign Franklin, PAPJM Feb 2018target 2024
Strinestown Solar Project
Solar
79.6 MWPaused / redesign York, PAPJM Sep 2018target 2027
Broomstick Solar Energy Centergy Center
Solar
50.0 MWPaused / redesign Christian, ILPJM Mar 2018target 2028
Hardin Energy Center β€šΓ„Γ¬ Storage I
Battery storage
50.0 MWPaused / redesign Hardin, OHPJM Mar 2018target 2025
Cadence Energy Storage
Battery storage
50.0 MWPaused / redesign Union, OHPJM Mar 2018target 2026
Recreation Solar
Solar
49.5 MWPaused / redesign Guernsey, OHPJM Sep 2018target 2025
Concho Solar I
Solar
49.0 MWPaused / redesign Queen Anne's, MDPJM Mar 2018target 2024
Vinton Energy Storage
Battery storage
42.0 MWPaused / redesign Vinton, OHPJM Aug 2018target 2026
Ho-Fel Solar
Solar
40.0 MWPaused / redesign Isle Of Wight, VAPJM Sep 2018target 2026
Blue Creek Wind Farm
Solar
26.0 MWPaused / redesign Van Wert, OHPJM Sep 2018target 2024
Confer Solar I
Solar
20.0 MWPaused / redesign Centre, PAPJM Oct 2018target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)