United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

SOLAR Β· PJM

Beaver Creek Solar

Beaver Creek Solar is a 80.3 MW solar request suspended in the PJM interconnection queue, in Franklin County, Pennsylvania, connecting to PENELEC.

Queue statusPaused / redesign
  1. PlanningQueued Feb 2018 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AD2-062
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Roxbury-Greene 138 kV
Location
Franklin County, Pennsylvania
Technology
Solar: 80.3 MW
Total requested
80.3 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Suspended
Entered queue
24 February 2018
Proposed online date
December 2024

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem