United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMSt. Thomas Township Solar Facility
St. Thomas Township Solar Facility is a 20.0 MW solar request built and operating in the PJM interconnection queue, in Franklin County, Pennsylvania, connecting to APS.
Request details
- Queue ID
- AB1-127
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- St. Thomas-Guilford 34.5kV
- Location
- Franklin County, Pennsylvania
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 29 October 2015
- Agreement signed
- 24 September 2018
- Proposed online date
- August 2020
- Came online
- August 2020
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Franklin County
- FR-WilliamsportSolar · 20.0 MW · agreement signed
- Solar project AH2-405, Franklin CountySolar · 100 MW · in study
- Solar project AI2-019, Franklin CountySolar · 5.0 MW · in study
- Beaver Creek SolarSolar · 80.3 MW · suspended
- Great Cove Solar IISolar · 150 MW · built
- Aspen Road SolarSolar · 100 MW · built
- Gas project E04_W20, Franklin CountyGas · 88.0 MW · built
- Orchard Park Generating StationOther · 23.3 MW · built
- St. Thomas Township Solar Facility IISolar · 20.0 MW · built
- Solar project AD1-061, Franklin CountySolar · 20.0 MW · built
- Blairs ValleySolar · 20.0 MW · built
- Upton SolarSolar · 15.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem