United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMRecreation Solar
Recreation Solar is a 49.5 MW solar request suspended in the PJM interconnection queue, in Guernsey County, Ohio, connecting to AEP.
Queue statusPaused / redesign
- PlanningQueued Sep 2018 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AE1-227
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- South Cumberland 69 kV
- Location
- Guernsey County, Ohio
- Technology
- Solar: 49.5 MW
- Total requested
- 49.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Suspended
- Entered queue
- 28 September 2018
- Proposed online date
- December 2025
Location
Marker shows the centre of Guernsey County; the queue data does not give exact sites.
Other requests in Guernsey County
- Guernsey Power StationGas Β· 1,100 MW Β· built
- Guernsey Power StationGas Β· 550 MW Β· built
- Guernsey Power StationGas Β· 225 MW Β· built
- Battery storage project AC1-124, Guernsey CountyBattery storage Β· 1.0 MW Β· withdrawn
- Battery storage project AC1-125, Guernsey CountyBattery storage Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem