United States › Grid › Interconnection queues › Illinois

ONSHORE WIND · PJM

Leaf River Wind

Leaf River Wind is a 150 MW onshore wind request in interconnection study in the PJM interconnection queue, in Ogle County, Illinois, connecting to ComEd.

Queue statusIn planning
  1. PlanningQueued Sep 2018 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2021 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AE1-114
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Developer
Leaf River Wind, LLC
Connection point (POI)
Maryland-Lancaster 138 kV
Location
Ogle County, Illinois
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Active
Entered queue
13 September 2018
Proposed online date
December 2021

Location

Marker shows the centre of Ogle County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Ogle County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem