BATTERY STORAGE · PJM

Hardin Energy Center – Storage I

Hardin Energy Center – Storage I is a 50.0 MW battery storage request suspended in the PJM interconnection queue, in Hardin County, Ohio, connecting to AEP.

Queue statusPaused / redesign
  1. PlanningQueued Mar 2018 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AD2-091
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Hardin Tap 345kV
Location
Hardin County, Ohio
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Suspended
Entered queue
20 March 2018
Proposed online date
December 2025

Location

Marker shows the centre of Hardin County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Hardin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem