BATTERY STORAGE · PJMVinton Energy Storage
Vinton Energy Storage is a 42.0 MW battery storage request suspended in the PJM interconnection queue, in Vinton County, Ohio, connecting to AEP.
Queue statusPaused / redesign
- PlanningQueued Aug 2018 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AE1-093
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Elk 138 kV
- Location
- Vinton County, Ohio
- Technology
- Battery: 42.0 MW
- Total requested
- 42.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Suspended
- Entered queue
- 31 August 2018
- Proposed online date
- December 2026
Location
Marker shows the centre of Vinton County; the queue data does not give exact sites.
Other requests in Vinton County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem