United States › Grid › Interconnection queues › Ohio

GAS · PJM

Rolling Hills Generating

Rolling Hills Generating is a 89.6 MW gas request built and operating in the PJM interconnection queue, in Vinton County, Ohio, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Mar 2020 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingFeb 2023 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AF2-395
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Flatlick 765 kV
Location
Vinton County, Ohio
Technology
Gas: 89.6 MW
Total requested
89.6 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
31 March 2020
Proposed online date
April 2023
Came online
February 2023

Location

Marker shows the centre of Vinton County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Vinton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem