OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA (2021 requests) — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project C1-16, Millard County Solar + storage · Neptune Solar Energy Park LLC |
199 MW | Paused / redesign |
| Solar project J2047, Desoto County Solar |
199 MW | In study |
| Solar + storage project GI-2021-6, Adams County Solar + storage |
199 MW | Paused / redesign |
| Solar + storage project C1-54, Utah County Solar + storage · Pinyon Creek Solar LLC |
199 MW | Paused / redesign |
| Solar + storage project C1-46, Klamath County Solar + storage · Diamond Solar Energy LLC |
199 MW | In study |
| Percy Farm Solar Solar · Percy Farm Solar 1, LLC |
199 MW | In study |
| Solar project J2071, Hardin County Solar |
198 MW | In study |
| Buttercup Hybrid Solar Solar + storage |
197 MW | In study |
| Solar project J1944, Sanilac County Solar |
185 MW | In study |
| Solar project J2237, Lee County Solar |
185 MW | In study |
| Solar project J1851, Morehouse Parish County Solar |
185 MW | In study |
| Solar project GEN-2021-108, Cass County Solar |
182 MW | In study |
| Hofbrau BESS Battery storage · Momentum Hofbrau LLC |
181 MW | In study |
| Solar + storage project J2219, Olmsted County Solar + storage |
180 MW | In study |
| Solar + storage project GI-2021-149, Imperial County Solar + storage |
175 MW | In study |
| Solar + storage project J2127, Jefferson Davis County Solar + storage |
173 MW | In study |
| Cascade Solar Solar |
171 MW | Paused / redesign |
| Solar project J1917, Livingston County Solar |
165 MW | In study |
| Aster Solar Solar · Aster Solar |
161 MW | In study |
| Solar + storage project 416, Broadwater County Solar + storage |
160 MW | Paused / redesign |
| Solar + storage project GEN-2021-063, Mccurtain County Solar + storage |
155 MW | In study |
| Quarter Ranch Solar Solar · Gransolar Texas Three LLC |
154 MW | In study |
| Thunder Road Energy Storage Battery storage · Hecate Grid Thunder Road Storage LLC |
153 MW | In study |
| Eighteenmile Solar SLF Solar + storage · Weser Solar, LLC |
153 MW | In study |
| Pradera Storage Solar + storage · Pradera Storage, LLC |
153 MW | In study |
| Stockdale Solar Solar |
153 MW | Paused / redesign |
| Bobor Storage Battery storage |
152 MW | In study |
| Heartfield Storage Other · Belltown Power Texas |
152 MW | Paused / redesign |
| Rock N' Roll Solar SLF Solar + storage · Rock N‚Äô Roll Solar, LLC |
152 MW | In study |
| Flores Storage Battery storage |
152 MW | In study |
| Onshore wind project J2053, Redwood County Onshore wind |
152 MW | In study |
| Solar + storage project G0716, Benton County Solar + storage |
150 MW | In study |
| Solar project IC-989, Johnson County Solar |
150 MW | Paused / redesign |
| Photo BESS 2 Solar + storage · CED Development Inc. |
150 MW | In study |
| Talbot Solar Solar |
150 MW | In study |
| Solar + storage project J2129, Barry County Solar + storage |
150 MW | In study |
| Crossroads Solar Solar + storage |
150 MW | In study |
| Solar + storage project C1-40, Yakima County Solar + storage · CG Yakima County Solar I LLC |
150 MW | In study |
| Solar + storage project AH2-021, Barren County Solar + storage |
150 MW | In study |
| Solar + storage project J2142, Adair County Solar + storage |
150 MW | In study |
| Solar + storage project IC-964, Emanuel County Solar + storage |
150 MW | Paused / redesign |
| Dellwood Solar Solar + storage |
150 MW | In study |
| Solar + storage project 21-11121, Weld County Solar + storage |
150 MW | In study |
| Triple B Solar Alt#2 Solar · Triple B Solar LLC |
150 MW | In study |
| Huning Energy Solar |
150 MW | In study |
| WA_150SB Project Solar + storage |
150 MW | Paused / redesign |
| Peregrine BESS Solar + storage · CED Development Inc. |
150 MW | In study |
| Cherry Tree Solar Solar + storage |
150 MW | In study |
| Solar project J1856, Jackson County Solar |
150 MW | In study |
| Solar project J2131, Jasper County Solar |
150 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)172 · 56.8 GW
- CAISO (California)70 · 31.5 GW
- ERCOT (Texas)116 · 23.2 GW
- MISO (Midcontinent)126 · 22.4 GW
- Southeast (non-ISO utilities)44 · 9,966 MW
- SPP (Southwest Power Pool)25 · 5,570 MW
- PJM (Mid-Atlantic, Midwest)49 · 2,072 MW
- NYISO (New York)11 · 991 MW
- ISO-NE (New England)3 · 525 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)