United States › Grid › Interconnection queues › Montana
SOLAR + STORAGE · WESTSolar + storage project 416, Broadwater County
Solar + storage project 416, Broadwater County is a 160 MW solar + storage request suspended in the West interconnection queue, in Broadwater County, Montana, connecting to NorthWestern Energy.
Queue statusPaused / redesign
- PlanningQueued Sep 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 416
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Three Rivers 230kV Substation
- Location
- Broadwater County, Montana
- Technology
- Solar: 160 MW · Battery
- Total requested
- 160 MW
- Service type
- NRIS and ERIS
- Study phase
- System Impact Study 12/27/2022 System Impact Re-study 5/5/2023 Facilities Study 11/1/2023
- Queue status
- Suspended
- Entered queue
- 24 September 2021
- Proposed online date
- December 2023
Location
Marker shows the centre of Broadwater County; the queue data does not give exact sites.
Other requests in Broadwater County
- Gas project 464, Broadwater CountyGas · 150 MW · in study
- Hydro project 458, Broadwater CountyHydro · 10.4 MW · in study
- Battery storage project 427, Broadwater CountyBattery storage · 200 MW · withdrawn
- Solar project 299, Broadwater CountySolar · 50.0 MW · withdrawn
- Hydro project 167, Broadwater CountyHydro · 9.8 MW · withdrawn
- Solar project 200, Broadwater CountySolar · 3.0 MW · withdrawn
- Solar project 199, Broadwater CountySolar · 3.0 MW · withdrawn
- Solar project 289, Broadwater CountySolar · 3.0 MW · withdrawn
- Solar project 201, Broadwater CountySolar · 3.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem