Solar project 201, Broadwater County

Solar project 201, Broadwater County is a 3.0 MW solar request withdrawn in the West interconnection queue, in Broadwater County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
201
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Townsend Substation, Townsend
Location
Broadwater County, Montana
Technology
Solar: 3.0 MW
Total requested
3.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
27 February 2015
Proposed online date
April 2016

Location

Marker shows the centre of Broadwater County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Broadwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem