United States › Grid › Interconnection queues › Georgia

SOLAR · SOUTHEAST

Talbot Solar

Talbot Solar is a 150 MW solar request in interconnection study in the Southeast interconnection queue, in Talbot County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Dec 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingAug 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-157
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Talbot County Energy – Butler Sub
Location
Talbot County, Georgia
Technology
Solar: 150 MW
Total requested
150 MW
Study phase
Facilities Study
Queue status
Active
Entered queue
1 December 2021
Proposed online date
December 2023
Came online
August 2023

Location

Marker shows the centre of Talbot County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Talbot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem