United States › Grid › Interconnection queues › Georgia

GAS · SOUTHEAST

Talbot U7

Talbot U7 is a 250 MW gas request in interconnection study in the Southeast interconnection queue, in Talbot County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Aug 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-194
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Talbot County 1 or 2 substation (TBD)
Location
Talbot County, Georgia
Technology
Gas: 250 MW
Total requested
250 MW
Study phase
Facilities Study
Queue status
Active
Entered queue
5 August 2024
Proposed online date
March 2029

Location

Marker shows the centre of Talbot County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Talbot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem