SOLAR + STORAGE · SOUTHEAST

Red Dirt Solar

Red Dirt Solar is a 153 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Talbot County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Apr 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-172
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Patsiliga Creek - Talbot County #1 230 kV
Location
Talbot County, Georgia
Technology
Solar: 153 MW · Battery
Total requested
153 MW
Study phase
Facilities Study
Queue status
Active
Entered queue
6 April 2023
Proposed online date
September 2026

Location

Marker shows the centre of Talbot County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Talbot County