United States › Grid › Interconnection queues › Georgia
BATTERY STORAGE · SOUTHEASTGPC Mossy Branch Battery Storage Station
GPC Mossy Branch Battery Storage Station is a 65.0 MW battery storage request built and operating in the Southeast interconnection queue, in Talbot County, Georgia, connecting to Southern Company.
Request details
- Queue ID
- IC-859
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Location
- Talbot County, Georgia
- Technology
- Battery: 65.0 MW
- Total requested
- 65.0 MW
- Study phase
- Operational
- Queue status
- Operational
- Entered queue
- 7 April 2020
- Agreement signed
- 10 March 2021
- Proposed online date
- May 2023
- Came online
- October 2024
Location
Marker shows the centre of Talbot County; the queue data does not give exact sites.
Other requests in Talbot County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem