SOLAR + STORAGE · CAISO

Buttercup Hybrid Solar

Buttercup Hybrid Solar is a 197 MW solar + storage request in interconnection study in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusIn planning
  1. PlanningQueued Apr 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2032 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
1970
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Le Grand 115 kV
Location
Merced County, California
Technology
Solar: 131 MW · Battery: 65.5 MW
Total requested
197 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
15 April 2021
Proposed online date
March 2032

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Merced County