United States › Grid › Interconnection queues › Michigan
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Michigan — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project J3800, Baraga County Gas |
1.8 MW | In study |
| Other project J646, Macomb County Other |
1.6 MW | Under construction |
| Other project L006, Otsego County Other |
-5.0 MW | In study |
| Other project L010 Other |
-8.0 MW | In study |
| Other project L003, Lenawee County Other |
-10.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)