OCTARY USA ยท INTERCONNECTION QUEUES

Queue requests in study in the USA (2020 requests) โ€” page 6

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown29757.2 GW
Active in queue117.0 GW635 requests
Agreement signed57.7 GW326 requests
Withdrawn1,752246.2 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

297 requests ยท page 6 of 6
ProjectCapacityStatusLocationRegionQueuedOnline
Scafell Storage
Battery storage
52.0 MWIn study San Diego, CACAISO Apr 2020target 2029
Solar project J1604, Henderson County
Solar
50.0 MWIn study Henderson, KYMISO Jul 2020target 2026
Top Crop Generating Facility
Battery storage ยท Blackstone Wind Farm, LLC
50.0 MWIn study Lasalle, ILPJM Mar 2020target 2023
Top Crop Generating Facility
Battery storage ยท Blackstone Wind Farm, LLC
50.0 MWIn study Lasalle, ILPJM Mar 2020target 2023
Solar project J1670, Mississippi County
Solar
50.0 MWIn study Mississippi, ARMISO Jun 2020target 2025
Geothermal project GI-2020-130, Imperial County
Geothermal
50.0 MWIn study Imperial, CAWest Jan 2020target 2028
Paulding Storage II
Battery storage ยท Paulding Wind Farm II LLC
50.0 MWIn study Paulding, OHPJM Mar 2020target 2023
Replace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3
Other
49.9 MWIn study Otter Tail, MNMISO May 20202023
South Branch Solar
Solar
46.0 MWPaused / redesign Hancock, OHPJM Jul 2020target 2025
Solar project Q346, Maricopa County
Solar
45.0 MWPaused / redesign Maricopa, AZWest Apr 2020target 2021
Sunrise Wind II
Offshore wind ยท Sunrise Wind LLC
44.0 MWIn study Suffolk, NYNYISO Jan 2020target 2027
Tain Solar
Solar ยท Abei Energy Green VII LLC
37.5 MWIn study Caldwell, TXERCOT Dec 2020target 2027
Gas project 377, Silver Bow County
Gas
36.0 MWPaused / redesign Silver Bow, MTWest May 2020target 2022
Ty Cooke
Gas
33.0 MWPaused / redesign Lubbock, TXERCOT Aug 2020target 2021
Gas project Q66, Maricopa County
Gas
30.0 MWIn study Maricopa, AZWest Nov 2020target 2022
Redbud-Gaylord 34.5 kV
Solar
30.0 MWPaused / redesign Frederick, VAPJM Jul 2020target 2026
Black Diamond Solar
Battery storage ยท Black Diamond Solar Power, LLC
30.0 MWIn study Christian, ILPJM Sep 2020target 2022
Surplus; J903
Other
30.0 MWIn study MISO Oct 2020
Gas project Q65, Maricopa County
Gas
30.0 MWIn study Maricopa, AZWest Nov 2020target 2022
Gas project IC-1012, Autauga County
Gas
27.0 MWIn study Autauga, ALSoutheast Oct 2020
Amelia Energy Facility
Solar ยท Amelia Energy Facility, LLC
25.0 MWIn study Amelia, VAPJM Feb 2020target 2022
Brazos Wind Repower
Onshore wind ยท BRAZOS WIND VENTURES, LLC
22.4 MWIn study Scurry, TXERCOT Dec 2020target 2025
Somers Solar, LLC
Solar ยท Somers Solar, LLC
20.0 MWIn study Washington, NYNYISO May 2020target 2026
SunEast Flat Stone Solar LLC
Solar ยท SED NY Holdings LLC
20.0 MWIn study Oneida, NYNYISO Mar 2020target 2026
Amelia Energy Facility
Solar ยท Amelia Energy Facility, LLC
20.0 MWIn study Amelia, VAPJM May 2020target 2023
Switchgrass Solar 1
Solar
20.0 MWPaused / redesign Accomack, VAPJM Feb 2020target 2025
Clear View Solar
Solar ยท Clear View LLC
20.0 MWIn study Steuben, NYNYISO Apr 2020
Millers Grove Solar
Solar ยท SED NY Holdings LLC
20.0 MWIn study Herkimer, NYNYISO Jul 2020target 2026
Clies 20 MW
Battery storage ยท Caithness LI Energy Storage, LLC
20.0 MWIn study Suffolk, NYNYISO Nov 2020target 2027
Transit Solar
Solar ยท SED NY Holding LLC
20.0 MWIn study Genesee, NYNYISO Jul 2020target 2028
Norwegian Solar
Solar
19.8 MWPaused / redesign Northumberland, PAPJM Apr 2020target 2024
Jarratt Energy Facility 2
Solar ยท Jarratt Energy Facility, LLC
18.0 MWIn study Greensville, VAPJM Mar 2020target 2022
Hays Energy Unit 3 Repower
Gas ยท HAYS ENERGY, LLC
18.0 MWIn study Hays, TXERCOT Oct 2020target 2026
Solar project AF2-294, Wayne County
Solar
17.0 MWPaused / redesign Wayne, PAPJM Mar 2020target 2025
Gas project Q64, Pinal County
Gas
17.0 MWIn study Pinal, AZWest Jun 2020target 2020
Stony Creek Solar
Solar
15.0 MWPaused / redesign Somerset, PAPJM Mar 2020target 2025
Morgan Street-Cochranton 34.5 kV
Solar
15.0 MWPaused / redesign Crawford, PAPJM Sep 2020target 2026
Aurora Battery Storage
Battery storage
10.0 MWPaused / redesign Will, ILPJM Oct 2020target 2028
Surplus; J893 (Searcy Solar)
Other
10.0 MWIn study MISO Jun 20202022
NJ Land Phase II
Solar
10.0 MWPaused / redesign Burlington, NJPJM Mar 2020target 2025
Scout Storage I
Battery storage
9.0 MWPaused / redesign Accomack, VAPJM Jan 2020target 2026
Surplus; Gibson Generating Station
Other
7.5 MWIn study MISO Jun 2020
Barbertown Solar
Solar
7.0 MWPaused / redesign Hunterdon, NJPJM Mar 2020target 2026
Furnace View Farms
Solar
5.0 MWPaused / redesign Berks, PAPJM Sep 2020target 2023
Greenfield CSG 1
Solar
4.0 MWPaused / redesign Erie, PAPJM Sep 2020target 2025
Springfield CSG 1
Solar
3.9 MWPaused / redesign Delaware, PAPJM Sep 2020target 2024
Great Lake Growers
Solar
2.6 MWPaused / redesign Erie, PAPJM Sep 2020target 2024
Page 6 of 6

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)